| Inspection |
Notes |
Performed By |
Date |
| Septic Release Inspection |
|
Health Dept |
10/15/2021 |
| Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Anthony Aslan |
12/8/2021 |
| Passed: Building - Monolithic Slab |
|
Troy Crews |
12/13/2021 |
| Passed: Engineering - Setbacks |
|
Troy Crews |
12/13/2021 |
| Failed: Building - Wall Sheathing |
Need To See Nails In Wall Strapping, All Holes Filled |
Anthony Aslan |
3/17/2022 |
| Passed: Building - Wall Sheathing |
Correction Made |
Anthony Aslan |
3/18/2022 |
| Passed: Building - Framing |
Need To Check Front Wall, Bottom Plate Splices And Corners Anchors Missing, Recheck Anchors At Next Inslection |
Anthony Aslan |
5/19/2022 |
| Passed: Electrical - 2nd Rough-In |
Pipes On Panel Need To Be Sealed |
Anthony Aslan |
7/26/2022 |
| Failed: Mechanical - Rough In |
Dryer Pipe Incomplete, Wrong Tape On Joints. No Nail Guards |
Anthony Aslan |
7/26/2022 |
| Failed: Plumbing/Gas - 2nd Rough-In |
Pipes In Bearing Walls Notched More Than 40-60 Need Double Stud |
Anthony Aslan |
7/26/2022 |
| Failed: Building - Insulation |
Have Failed Mech. & Plumbing Must Have Before Insulation |
Anthony Aslan |
9/9/2022 |
| Passed: Plumbing/Gas - 2nd Rough-In |
|
Anthony Aslan |
9/14/2022 |
| Passed: Mechanical - Rough In |
Spoke W/ Roger, Kitchen Through Roof, Dryer Vent Strapped |
Anthony Aslan |
9/14/2022 |
| Passed: Building - Insulation |
Check Attic At Final.
need To Get Inspections Completed Before Moving On |
Anthony Aslan |
2/23/2023 |
| Passed: Electrical - Permanent Power |
|
Anthony Aslan |
2/23/2023 |
| Release to power company |
|
Anthony Aslan |
2/23/2023 |
| Passed: Building - Final |
Need Final Termite, Tub Window Tempered |
Anthony Aslan |
3/23/2023 |