Permit Details

Permit Search

Permit

New Residential Construction

255 SW PINEHURST DR
LAKE CITY, FL 32024

Permit #
000043012
Application #
51559
Status Completed
  1. Submitted Oct 13, 2021
  2. Issued Oct 22, 2021
  3. Expires Oct 8, 2023
  4. Completed May 2, 2023

Property

Parcel #
03087-105
Owner
Entrust Holdings Llc
Acres
0.71
Subdivision
Forest Country Sixth Addition
Zoning
RSF-2
Flood zone
X
District
3

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Subdivision Plat
Finished floor requirement
102.40'
Requirement needed
By Nailing Inspection
Document needed is
a Surveyor letter giving the Finished Floor Elevation
Document receieved
Yes
Fema map number
12023C0289D
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
25'
Setback Side 1
10'
Setback Side 2
10'
Setbacks Rear
15'
Stories
1
Heated Area (Sqft)
2499
Total Area (Sqft)
3300
Building Height
21
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
21-0763
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.

Status & Review History

  1. Point Review - Status Cleared
  2. Point Review - Received-Hard Copy Application
  3. Zoning Review - Reviewed
  4. Plan Review - Plumbing Approved
  5. Plan Review - Mechanical Approved
  6. Plan Review - Electrical Approved
  7. Plan Review - Building Approved
  8. Plan Review - Reviewed
  9. Zoning Review - Reviewed
  10. Final Review - Documents Required
  11. Permit Issued
  12. Final Review - Payment Needed

Contractors

  • Frank A Todd Iii(mike)

    Mike Todd Construction Inc

    License
    CGC006209
    Title
    General Contractor
    Role
    Contractor
  • Marcus Matthews

    Matthews Electric Llc

    License
    EC13005459
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Don C Bills Sr

    Hometown Plumbing Services Llc

    License
    CFC1428890
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Derrick L Williams

    Dl Williams Heating & Cooling Llc

    License
    CAC1816913
    Title
    Class "b" A/c Contractor
    Role
    Subcontractor

Inspections

  1. Jan 19, 2022

    Cancelled: Building - Footer

    Inspected by Troy Crews

  2. Jan 19, 2022

    Cancelled: Engineering - Setbacks

    Inspected by Troy Crews

  3. Jan 19, 2022

    Cancelled: Electrical - Temporary Service

    Inspected by Troy Crews

  4. Jan 20, 2022

    Passed: Building - Footer

    Inspected by Matt Forsyth

  5. Jan 20, 2022

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  6. Jan 20, 2022

    Cancelled: Electrical - Temporary Service

    Inspected by Matt Forsyth

  7. Mar 7, 2022

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Troy Crews

  8. Mar 10, 2022

    Passed: Building - Slab

    Fibermesh Concrete

    Inspected by Matt Forsyth

  9. Jun 21, 2022

    Passed: Building - Framing

    Inspected by Matt Forsyth

  10. Jun 21, 2022

    Cancelled: Building - Slab

    Inspected by Matt Forsyth

  11. Aug 3, 2022

    Passed: Building - Insulation

    Inspected by Matt Forsyth

  12. Aug 3, 2022

    Failed: Electrical - 2nd Rough-In

    Need Letter From Electrician Stating Work Complies With Nec

    Inspected by Matt Forsyth

  13. Aug 3, 2022

    Failed: Mechanical - Rough In

    Not Complete

    Inspected by Matt Forsyth

  14. Aug 3, 2022

    Failed: Plumbing/Gas - 2nd Rough-In

    No Pressure On Water Supply

    Inspected by Matt Forsyth

  15. Aug 8, 2022

    Failed: Mechanical - Rough In

    Dryer Vent Missing

    Inspected by Matt Forsyth

  16. Aug 8, 2022

    Failed: Plumbing/Gas - 2nd Rough-In

    Water Supply To Tub Needs To Be Capped And Pressurized

    Inspected by Matt Forsyth

  17. Aug 22, 2022

    Failed: Electrical - 2nd Rough-In

    Drywall Was Finished Without 2nd Rough Inspections

    Inspected by Matt Forsyth

  18. Aug 22, 2022

    Failed: Plumbing/Gas - 2nd Rough-In

    Drywall Was Completed Before Second Rough Inspections

    Inspected by Matt Forsyth

  19. Dec 16, 2022

    Failed: Electrical - Permanent Power

    Need Letter From Plumber That Work Was Done To Local Code Also Septic And Drive Releases

    Inspected by Matt Forsyth

  20. Feb 20, 2023

    Septic Release Inspection

    Inspected by Health Dept

  21. Mar 2, 2023

    Cancelled: Electrical - Permanent Power

    Inspected by Melissa Garber

  22. Mar 3, 2023

    Passed: Electrical - Permanent Power

    Inspected by Matt Forsyth

  23. Mar 3, 2023

    Release to power company

    Inspected by Matt Forsyth

  24. Apr 11, 2023

    Passed: Building - Final

    Need Bdt And Final Termite Treatment

    Inspected by Matt Forsyth

  25. May 2, 2023

    Certificate-Release Certificate

    Inspected by Matt Forsyth

Documents