Roof Replacement or Repair
Permit
| Application #: | 51890 |
| Permit #: |
000042901 |
| Related Permit: |
|
| Submitted: | Friday, October 1, 2021 |
| Issued: | Wednesday, October 6, 2021 |
| Expires: | Tuesday, April 12, 2022 |
| Completed: | |
| Status: |
Permit Issued |
| Septic Release? |
N/A |
Job Details
| Finished floor requirement |
|
| Fema map number |
12023C0294D |
| Type Roofing Job |
Replacement - Tear off Existing and Replace |
| Type of structure |
House |
| Commercial or Residential |
Residential |
| Roof Area (for this job) Sq Ft |
0.00 |
| No. of Stories |
1 |
| Roof Pitch |
4:12 or Greater |
| Is the existing roof being removed? |
Yes |
| Type of New Roofing Product |
Asphalt Shingles |
| Florida Product Approval Number |
FL35321 |
| Product Manufacturer |
Tamko |
| Product Description |
Rustic Black |
| Building Code Edition |
2020 Florida Building Code 7th Edition and Florida Statute 553.844 |
| Sealed roof decking options: (Must select an option.) |
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof. |
| Ventilation: |
Off-ridge Vent |
| Flashing: |
Use Existing |
| Drip Edge: |
Replace All |
| Valley Treatment: |
New Mineral Surface |
| Any cable and/or race-way wiring located on or within the roof assembly? |
No |
Review Notes
| 9/29/2021 |
Application pending. |
| 10/1/2021 |
Final Review - Corrections Needed |
| 10/5/2021 |
Final Review - Payment Needed |
| 10/6/2021 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Caleb Cross Florida Premier Roofing Llc
Workers Comp Expired. |
CCC1332129 |
Cert. Roofing |
Contractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Re-Roof - In Progress |
Double Underlayment Confirmed In In Progress Inspection |
Matt Forsyth |
10/14/2021 |