Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 334 SW PADDOCK CT
LAKE CITY, FL 32024
Parcel #: 08920-104
Acres: 4.27
Owner: Timothy M. And Sherry L. Shaheen
Subdivision: Briarwood Replat
Zoning: PRRD
Flood Zone: X
District: 5
Application #: 49379
Permit #: 000042842
Related Permit: Culvert: 000042843
Submitted: Friday, June 11, 2021
Issued: Monday, September 27, 2021
Expires: Thursday, October 20, 2022
Completed: Thursday, October 20, 2022
Status: Completed
Septic Release? Yes
Notes:
PERMIT ISSUED TO THE PLATED LOT 4 OF RECORD IN SUBDIVISION - REPLAT OF BRIARWOOD S/D ELEVATION CONFIRMATION REC'D @ 91.15'
Job Details
Elevation regulation Subdivision Plat
Finished floor requirement 86'
Requirement needed By Nailing Inspection
Document needed is a Surveyor letter giving the Finished Floor Elevation
Fema map number 12023C0382D
In floodway N
Building Permit # 000040815
Standards Shall conform to Public Works Determinations as stated below
Requirements Install min, 24 ft x 18in corr metal culvert w / concrete mitred ends, w / 6 " × 6 " welded wire, rebar or culvert bolts in mitred ends, concrete mitred ends W - 4ft x L - 5ft, and with 4 inches of limerock on top cover.
Status Approved
Review Notes
5/19/2021 Application pending.
6/14/2021 Point Review - On Hold-Incomplete PLEASE UPLOAD ALL NECESSARY DOCUMENTS
7/13/2021 Point Review - On Hold-Incomplete PLEASE UPLOAD ALL NECESSARY DOCUMENTS
8/12/2021 Point Review - On Hold-Incomplete PLEASE UPLOAD ALL NECESSARY DOCUMENTS
8/12/2021 Point Review - Printed-Online Application NEEDED: SEALED STRUCTURAL PLANS, TRUSS ENGINEERING, MANUAL J, ENERGY CODE FORM, ENVIRONMENTAL HEALTH APPROVED PAPERWORK
8/12/2021 Zoning Review - Reviewed NEEDED: SEALED STRUCTURAL PLANS, TRUSS ENGINEERING, MANUAL J, ENERGY CODE FORM, ENVIRONMENTAL HEALTH APPROVED PAPERWORK
8/12/2021 Final Review - Documents Required NEEDED: SEALED STRUCTURAL PLANS, TRUSS ENGINEERING, MANUAL J, ENERGY CODE FORM, ENVIRONMENTAL HEALTH APPROVED PAPERWORK
8/12/2021 Plan Review - On Hold-Incomplete NEEDED: SEALED STRUCTURAL PLANS, TRUSS ENGINEERING, MANUAL J, ENERGY CODE FORM, ENVIRONMENTAL HEALTH APPROVED PAPERWORK
8/13/2021 Plan Review - On Hold-Incomplete NEEDED: SEALED STRUCTURAL PLANS, TRUSS ENGINEERING, MANUAL J, ENERGY CODE FORM, ENVIRONMENTAL HEALTH APPROVED PAPERWORK
8/18/2021 Plan Review - On Hold-Incomplete NEEDED: SEALED STRUCTURAL PLANS, TRUSS ENGINEERING, MANUAL J, ENERGY CODE FORM, ENVIRONMENTAL HEALTH APPROVED PAPERWORK
8/26/2021 Plan Review - On Hold-Incomplete NEEDED: SEALED STRUCTURAL PLANS, TRUSS ENGINEERING, MANUAL J, ENERGY CODE FORM, ENVIRONMENTAL HEALTH APPROVED PAPERWORK
9/1/2021 Plan Review - On Hold-Incomplete NEEDED: SEALED STRUCTURAL PLANS, TRUSS ENGINEERING, MANUAL J, ENERGY CODE FORM, ENVIRONMENTAL HEALTH APPROVED PAPERWORK
9/3/2021 Plan Review - On Hold-Incomplete NEEDED: TRUSS ENGINEERING
9/7/2021 Plan Review - Documents Required NEEDED: TRUSS ENGINEERING
9/7/2021 Plan Review - Documents Required NOT FULL SET OF TRUSS DRAWINGS ONLY FRONT PAGE AND BRACING
9/8/2021 Plan Review - Plumbing Approved
9/8/2021 Plan Review - Mechanical Approved
9/8/2021 Plan Review - Electrical Approved
9/8/2021 Plan Review - Building Approved
9/8/2021 Plan Review - Reviewed
9/8/2021 Final Review - Corrections Needed CULLY, WHO IS JON MORRIS?, PLANS REF: NICK AS ARCHITECT. PLEASE CHANGE ENGINEER TO NICK GEISLER ALONG WITH HIS ADDRESS
9/24/2021 Final Review - Payment Needed
9/27/2021 Permit Issued Permit #000042842 created and approved.
5/12/2022 Final Review - Payment Needed
9/9/2022 Final Review - Payment Needed
10/19/2022 Final Review - Payment Needed
Contractors
Name/ Business License Title Role
Isaiah Cully
Ic Construction Llc
CBC1259655 Building Contractor Contractor
Tyler M Turner
Tmt Roofing Llc
CCC1330410 Cert Roofing Subcontractor
Clinton G Wilson
Wilson Heat & Air Inc
CAC057886 Class B A/c Subcontractor
Kenneth R Roche
Ken Roche Plumbing Inc Dba Plumbing Now
CFC1426527 Plumbing Contractor Subcontractor
Clyde Morgan
Tom Jenkins Electrical Service Inc
EC13001161 Electrical Contractor Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Initial Driveway Mccormick, David 9/28/2021
Passed: Building - Footer Troy Crews 11/4/2021
Passed: Engineering - Setbacks Troy Crews 11/4/2021
Passed: Plumbing/Gas - 1st Underground Rough–In Matt Forsyth 12/17/2021
Passed: Building - Slab Need 6 Inch Wall At Shower Matt Forsyth 12/28/2021
Passed: Building - Roof Decking Anthony Aslan 2/17/2022
Failed: Building - Wall Sheathing Sheathing Missing On Back Porch, Gable Top West Wall, Garage Front Gable. Anthony Aslan 2/17/2022
Passed: Building - Framing Bearing Top Plates Notched More Than 50% Need Tension Strap Anthony Aslan 4/4/2022
Passed: Building - Ext Strapping/Wall Sheathing Anthony Aslan 4/4/2022
Passed: Plumbing/Gas - 2nd Rough-In Anthony Aslan 5/11/2022
Passed: Electrical - 2nd Rough-In Anthony Aslan 5/11/2022
Passed: Electrical - Temporary Service Anthony Aslan 5/11/2022
Release to power company Anthony Aslan 5/11/2022
Passed: Building - Wall Sheathing Did Not See Unfinished Wall Sheating Anthony Aslan 5/24/2022
Passed: Building - Insulation Anthony Aslan 5/24/2022
Septic Release Inspection Health Dept 7/22/2022
Passed: Engineering - Final Driveway Smith, Blake 8/9/2022
Failed: Electrical - Permanent Power Not Ready, Multiple Outlets No Cover Plates, Panel Cover Off, Wires Not Safety Off. Anthony Aslan 9/2/2022
Passed: Electrical - Permanent Power Anthony Aslan 9/12/2022
Release to power company Anthony Aslan 9/12/2022
Failed: Building - Final Cover Off Panel By A/c , Electrical Covers Missing On Outside Boxes, Kitchen Back Splash Wall Outlets Not Gfic, Master Tub Water On Floor Right Side, Master Shower Sit Not Grouted, Master Attic Access Water Pipes Crossing Opening, Smoke Detectors Not Working. Anthony Aslan 10/6/2022
Cancelled: Building - Final Anthony Aslan 10/7/2022
Failed: Building - Final No Arc Fault On House outlets Left Of Stove Not Correct Wire Unable To Trip Gfci outlet Right Side Of Island Not Gfci needs To Be Complete Next Inspection Or $50 Fee Will Be Accessed Anthony Aslan 10/13/2022
Failed: Building - Final Bedroom Outlets Still Not Afci & Gfci Protected Per Code, Kitchen Outlet By Refrigerator Not Gfci, Reinspection Fee Due Before Reinspection Anthony Aslan 10/19/2022
Passed: Building - Final Corrections Made Anthony Aslan 10/20/2022
Cancelled: Building - Final Anthony Aslan 10/20/2022
Documents
File Name Date File Size
Original Permit 20201029.pdf 2025.06.22 51.77kB