Permit Details

Permit Search

Permit

Mobile Home

298 SW PIONEER WAY
FORT WHITE, FL 32038

Permit #
000042832
Application #
50399
Status Completed
  1. Submitted Aug 30, 2021
  2. Issued Sep 24, 2021
  3. Expires Jun 15, 2022
  4. Completed Dec 29, 2021

Property

Parcel #
03818-183
Owner
Dozier David & Jacqueline
Acres
4.01
Subdivision
Old Wire Farms
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0480C
In floodway
N
Mobile Home is a:
Single Wide
Year Built
2022
Width (Ft.In)
16
Length (Ft.In)
56
Driveway access to home:
Existing Drive
Installation Decal #
65814
Septic #
21-0739
Setbacks Front
30
Setback Side 1
25
Setbacks Rear
25
Dev Permit #
F023-
Setback Side 2
25
Are you applying for a 5 year temporary permit?
No
Serial #
LOHGA10036746
Wind Zone?
2
Residential or Commercial Use?
Residential

Status & Review History

  1. Application pending.
  2. Plan Review - Reviewed
  3. Point Review - Printed-Online Application
  4. Point Review - Reviewed
  5. Plan Review - Reviewed
  6. Zoning Review - Reviewed
  7. Final Review - Reviewed
  8. Final Review - Payment Needed
  9. Permit Issued

Contractors

  • Brent M Strickland

    License
    IH1104218
    Title
    Mh Installer (ih)
    Role
    Contractor
  • Glenn Whittington

    Whittington Electric Inc

    License
    EC13002957
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Ronald Bonds Sr

    Style Crest Inc

    License
    CAC1817658
    Title
    Class "b" A/c Contractor
    Role
    Subcontractor

    County License & State License Expired.

Inspections

  1. Dec 17, 2021

    Passed: Engineering - Setbacks

    Inspected by Anthony Aslan

  2. Dec 17, 2021

    Passed: Mobile Home - Mobile Home Set-Up Final

    Need Septic Release

    Inspected by Anthony Aslan

  3. Dec 29, 2021

    Release to power company

    Inspected by Laurie Hodson

  4. Dec 29, 2021

    Certificate-Release Certificate

    Inspected by Anthony Aslan

  5. Dec 29, 2021

    Septic Release Inspection

    Inspected by Health Dept