Inspection |
Notes |
Performed By |
Date |
Passed: Electrical - Temporary Service |
|
Matt Forsyth |
9/23/2021 |
Release to power company |
|
Matt Forsyth |
9/23/2021 |
Passed: Engineering - Initial Driveway |
|
Mccormick, David |
9/27/2021 |
Passed: Building - Footer |
|
Troy Crews |
10/7/2021 |
Passed: Engineering - Setbacks |
|
Troy Crews |
10/7/2021 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
11/10/2021 |
Passed: Building - Slab |
Fibermesh Concrete |
Matt Forsyth |
11/19/2021 |
Passed: Building - Lintel/Tie Beam |
|
Matt Forsyth |
1/18/2022 |
Passed: Building - Masonry Wall Reinforcing |
|
Matt Forsyth |
1/18/2022 |
Passed: Building - Vertical Cells/Columns |
Inspection Ports 4 Block |
Matt Forsyth |
1/26/2022 |
Passed: Building - Roof Decking |
|
Matt Forsyth |
2/17/2022 |
Failed: Building - Framing |
Stud Packs Missing On Truss Load Bearing Points |
Matt Forsyth |
3/30/2022 |
Passed: Building - Strapping |
|
Matt Forsyth |
3/30/2022 |
Passed: Electrical - 2nd Rough-In |
|
Matt Forsyth |
3/30/2022 |
Failed: Mechanical - Rough In |
Not Complete |
Matt Forsyth |
3/30/2022 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Matt Forsyth |
3/30/2022 |
Passed: Building - Framing |
|
Matt Forsyth |
4/1/2022 |
Passed: Mechanical - Rough In |
|
Matt Forsyth |
4/1/2022 |
Passed: Building - Insulation |
Walls And Vaulted Ceiling Only Check Trey Ceiling On Final |
Matt Forsyth |
4/19/2022 |
Septic Release Inspection |
|
Health Dept |
8/2/2022 |
Passed: Electrical - Permanent Power |
Need Driveway Release |
Matt Forsyth |
8/5/2022 |
Passed: Engineering - Final Driveway |
|
Smith, Blake |
8/30/2022 |
Failed: Electrical - Permanent Power |
Need Call Back From Electrician For Final Release |
Troy Crews |
9/27/2022 |