Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 169 SW PINEHURST DR
LAKE CITY, FL 32024
Parcel #: 03087-102
Acres: 0.71
Owner: Vision Property Development
Subdivision: Forest Country Sixth Addition
Zoning: RSF-2
Flood Zone: X
District: 3
Application #: 50149
Permit #: 000042724
Related Permit: Culvert: 000042725
Submitted: Monday, August 30, 2021
Issued: Monday, September 13, 2021
Expires: Tuesday, February 8, 2022
Completed: Tuesday, February 8, 2022
Status: Completed
Septic Release? Yes
Notes:
FINISHED FLOOR ELEVATION LETTER AT 104.18' ON FILE
Job Details
Elevation regulation Subdivision Plat
Finished floor requirement 104.10
Requirement needed By Nailing Inspection
Document needed is a Surveyor letter giving the Finished Floor Elevation
Document receieved Yes
Fema map number 12023C0289D
In floodway N
This is the construction of a Single Family Dwelling
Setbacks Front 25
Setback Side 1 10
Setback Side 2 10
Setbacks Rear 15
Stories 1
Heated Area (Sqft) 2239
Total Area (Sqft) 3134
Building Height 24
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title single family
Building Code Edition 2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000) 21-0589
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition) a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Review Notes
8/2/2021 Application pending.
8/31/2021 Point Review - Printed-Online Application
8/31/2021 Point Review - Reviewed
9/1/2021 Zoning Review - Reviewed
9/9/2021 Plan Review - Corrections Needed
9/9/2021 Plan Review - Processing
9/9/2021 Plan Review - Plumbing Approved
9/9/2021 Plan Review - Mechanical Approved
9/9/2021 Plan Review - Electrical Approved
9/9/2021 Plan Review - Building Approved
9/9/2021 Plan Review - Reviewed
9/10/2021 Zoning Review - Reviewed
9/10/2021 Final Review - Reviewed
9/10/2021 Final Review - Payment Needed
9/13/2021 Permit Issued
1/13/2022 Final Review - Payment Needed
Contractors
Name/ Business License Title Role
James Zuber
All Seasons Planning, Inc.
CGC1517099 General Contractor Contractor
Daniel Mossburg
Live Oak Plumbing, Inc.
County License & State License & Liability Insurance & Workers Comp & Employees Workers Comp Expired.
CFC1427438 Plumbing Contractor Subcontractor
Ralph W Laverdure
Rwl Roofing,llc.
CCC1328590 Roofing Contractor Subcontractor
Benjamin L Sparks
Line Electric Company Llc
EC13009101 Cert. Electrical Subcontractor
Stephen M Brisbois
Epic Ac Service (dba) Central Home Heating & Air Llc
CAC1819412 Cert. A/c Class “b” Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Initial Driveway Mccormick, David 9/13/2021
Passed: Building - Footer Matt Forsyth 9/16/2021
Passed: Engineering - Setbacks Matt Forsyth 9/16/2021
Passed: Plumbing/Gas - 1st Underground Rough–In Matt Forsyth 9/28/2021
Passed: Electrical - Temporary Service Matt Forsyth 9/29/2021
Release to power company Matt Forsyth 9/29/2021
Passed: Building - Slab Matt Forsyth 10/6/2021
Passed: Building - Roof Decking Matt Forsyth 11/10/2021
Passed: Building - Ext Strapping/Wall Sheathing Matt Forsyth 11/10/2021
Cancelled: Building - Ext Strapping/Wall Sheathing Troy Crews 11/19/2021
Cancelled: Building - Roof Decking Troy Crews 11/19/2021
Cancelled: Building - Strapping Troy Crews 11/19/2021
Cancelled: Building - Wall Sheathing Troy Crews 11/19/2021
Cancelled: Building - Rated Assembly Fastening Troy Crews 11/19/2021
Cancelled: Building - Ext Strapping/Wall Sheathing Troy Crews 11/22/2021
Cancelled: Building - Strapping Troy Crews 11/22/2021
Passed: Building - Framing Matt Forsyth 11/23/2021
Passed: Electrical - 2nd Rough-In Matt Forsyth 11/23/2021
Passed: Mechanical - Rough In Matt Forsyth 11/23/2021
Passed: Plumbing/Gas - 2nd Rough-In Matt Forsyth 11/23/2021
Passed: Plumbing/Gas - Tub Set/Shower Pan Tub Matt Forsyth 11/23/2021
Passed: Building - Insulation Walls Only Matt Forsyth 11/29/2021
Passed: Electrical - Permanent Power Need Septic And Driveway Release Matt Forsyth 1/18/2022
Passed: Engineering - Final Driveway Smith, Blake 1/20/2022
Septic Release Inspection Health Dept 1/20/2022
Release to power company Melissa Garber 1/24/2022
Release to power company Melissa Garber 1/27/2022
Passed: Building - Insulation Matt Forsyth 2/4/2022
Failed: Building - Final Italked To Ele Contracter Need Gfci Looked At Concern Is Bathrooms And Porchs Matt Forsyth 2/4/2022
Passed: Building - Final Matt Forsyth 2/8/2022