Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
Mccormick, David |
9/7/2021 |
Passed: Electrical - Temporary Service |
|
Matt Forsyth |
9/7/2021 |
Release to power company |
|
Matt Forsyth |
9/7/2021 |
Passed: Engineering - Setbacks |
|
Anthony Aslan |
9/21/2021 |
Passed: Building - Footer |
Need Grounding Wire On Rebar |
Anthony Aslan |
9/21/2021 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
10/8/2021 |
Passed: Building - Slab |
|
Anthony Aslan |
10/12/2021 |
Passed: Building - Masonry Wall Reinforcing |
|
Anthony Aslan |
10/26/2021 |
Passed: Engineering - Final Driveway |
|
Jones, Richard |
11/15/2021 |
Passed: Building - Roof Decking |
|
Anthony Aslan |
12/8/2021 |
Failed: Building - Framing |
Nails Missing On Straps, Red Marker Arrows. |
Anthony Aslan |
12/15/2021 |
Passed: Building - Framing |
Corrections Made |
Anthony Aslan |
1/11/2022 |
Passed: Electrical - 2nd Rough-In |
|
Anthony Aslan |
1/11/2022 |
Passed: Mechanical - Rough In |
Check Dryer Box At Insulation |
Anthony Aslan |
1/11/2022 |
Failed: Plumbing/Gas - 2nd Rough-In |
No Pressure On System |
Anthony Aslan |
1/11/2022 |
Passed: Building - Insulation |
|
Anthony Aslan |
1/18/2022 |
Cancelled: Mechanical - Rough In |
|
Anthony Aslan |
2/11/2022 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Anthony Aslan |
2/11/2022 |
Passed: Electrical - Permanent Power |
|
Anthony Aslan |
2/11/2022 |
Release to power company |
|
Anthony Aslan |
2/11/2022 |
Failed: Building - Final |
Need Make Up Air Automatic Damper, Blower Door Test 1.9 Requires
need Disconnect Or Lockout For Water Heater And Air Handler Breaker Panel Not With In Sight.
need Bollard For Water Heater And Air Handler In Garage. |
Anthony Aslan |
4/6/2022 |
Passed: Building - Final |
Rec'd Pictures |
Anthony Aslan |
4/7/2022 |
Septic Release Inspection |
|
Health Dept |
4/27/2022 |