Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 329 SE HOLLY TER
LAKE CITY, FL 32025
Parcel #: 08631-110
Acres: 4.92
Owner: Crowther Richard A Irrevocable Special Needs Trust
Subdivision: Creek Run Plantation
Zoning: A-3
Flood Zone: X
District: 4
Application #: 50284
Permit #: 000042690
Related Permit: Culvert: 000042691
Submitted: Tuesday, August 17, 2021
Issued: Friday, September 3, 2021
Expires: Thursday, April 7, 2022
Completed: Thursday, April 7, 2022
Status: Completed
Septic Release? Yes
Notes:
ELEVATION CONFIRMATION REC'D @ 109'
Job Details
Elevation regulation Subdivision Plat
Finished floor requirement 101'
Requirement needed By Nailing Inspection
Document needed is a Surveyor letter giving the Finished Floor Elevation
Document receieved Yes
Fema map number 12023C0313D
In floodway N
This is the construction of a Single Family Dwelling
Setbacks Front 30'
Setback Side 1 25'
Setback Side 2 25'
Setbacks Rear 25'
Stories 1
Heated Area (Sqft) 1807
Total Area (Sqft) 2463
Building Height 22
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title single family dwelling
Building Code Edition 2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000) 21-0624
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition) a self-adhering polymer-modified bitumen underlayment complying with ASTM D1970 applied over the entire roof.
Review Notes
8/17/2021 Application pending.
8/17/2021 Point Review - Printed-Online Application
8/17/2021 Point Review - Reviewed
8/19/2021 Zoning Review - Documents Required "SITE PLAN" THAT WAS SUBMITTED IS THE SUBDIVISION PLAT. WE WILL NEED A DETAILED SITE PLAN THAT SHOWS MEASUREMENTS FROM THE PROPERTY LINES TO THE PROPOSED HOME BEFORE ZONING REVIEW CAN BE DONE.
8/20/2021 Zoning Review - Reviewed
9/1/2021 Zoning Review - Documents Required
9/1/2021 Plan Review - Documents Required NEED SITE PLAN WITH ALL MEASURMENTS TO PROPERTY LINES NEED SHEETS S-1,S-2, AND S-3 SEALED ONLY S-4 SEALED NOW
9/1/2021 Plan Review - Plumbing Approved
9/1/2021 Plan Review - Mechanical Approved
9/1/2021 Plan Review - Electrical Approved
9/1/2021 Plan Review - Building Approved
9/1/2021 Plan Review - Reviewed
9/3/2021 Zoning Review - Corrections Needed SITE PLAN NEEDS TO BE ACCURATE. EMAILED APPLICANT 9.3.21-LH
9/3/2021 Zoning Review - Reviewed
9/3/2021 Final Review - Payment Needed
9/3/2021 Permit Issued Permit #000042690 created and approved.
2/9/2022 Final Review - Payment Needed
Contractors
Name/ Business License Title Role
Joann T Lev
Exceptions Realty Llc
Liability Insurance & Workers Comp Expired.
CRC1329719 Cert. Residential Contractor
Cody Barrs
Barrs Plumbing Inc
CFC1427145 Plumbing Contractor Subcontractor
Dana D Johnson
Mac Johnson Roofing Inc Dba Gulf Coast Metal Roofing
CCC1325497 Cert Roofing Subcontractor
Everton D Ruddock
D&s Lighting Inc
EC13003800 Electrical Contractor Subcontractor
Anthony R Franks
Franks & Lane Heating And Air Llc
Liability Insurance Expired.
CAC1818631 Cert. A/c Class “b” Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Initial Driveway Mccormick, David 9/7/2021
Passed: Electrical - Temporary Service Matt Forsyth 9/7/2021
Release to power company Matt Forsyth 9/7/2021
Passed: Engineering - Setbacks Anthony Aslan 9/21/2021
Passed: Building - Footer Need Grounding Wire On Rebar Anthony Aslan 9/21/2021
Passed: Plumbing/Gas - 1st Underground Rough–In Troy Crews 10/8/2021
Passed: Building - Slab Anthony Aslan 10/12/2021
Passed: Building - Masonry Wall Reinforcing Anthony Aslan 10/26/2021
Passed: Engineering - Final Driveway Jones, Richard 11/15/2021
Passed: Building - Roof Decking Anthony Aslan 12/8/2021
Failed: Building - Framing Nails Missing On Straps, Red Marker Arrows. Anthony Aslan 12/15/2021
Passed: Building - Framing Corrections Made Anthony Aslan 1/11/2022
Passed: Electrical - 2nd Rough-In Anthony Aslan 1/11/2022
Passed: Mechanical - Rough In Check Dryer Box At Insulation Anthony Aslan 1/11/2022
Failed: Plumbing/Gas - 2nd Rough-In No Pressure On System Anthony Aslan 1/11/2022
Passed: Building - Insulation Anthony Aslan 1/18/2022
Cancelled: Mechanical - Rough In Anthony Aslan 2/11/2022
Passed: Plumbing/Gas - 2nd Rough-In Anthony Aslan 2/11/2022
Passed: Electrical - Permanent Power Anthony Aslan 2/11/2022
Release to power company Anthony Aslan 2/11/2022
Failed: Building - Final Need Make Up Air Automatic Damper, Blower Door Test 1.9 Requires need Disconnect Or Lockout For Water Heater And Air Handler Breaker Panel Not With In Sight. need Bollard For Water Heater And Air Handler In Garage. Anthony Aslan 4/6/2022
Passed: Building - Final Rec'd Pictures Anthony Aslan 4/7/2022
Septic Release Inspection Health Dept 4/27/2022