Inspection |
Notes |
Performed By |
Date |
Failed: Plumbing/Gas - 1st Underground Rough–In |
Air Trapped In Toilets And Other Stub Ups. |
Anthony Aslan |
10/6/2021 |
Passed: Electrical - 1st Underground Rough–In |
|
Anthony Aslan |
10/8/2021 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Anthony Aslan |
10/8/2021 |
Passed: Engineering - Setbacks |
|
Anthony Aslan |
10/14/2021 |
Passed: Building - Monolithic Slab |
|
Anthony Aslan |
10/14/2021 |
Passed: Building - Slab |
|
Anthony Aslan |
10/22/2021 |
Failed: Building - Roof Decking |
Check Nails Lose Sheathing |
Anthony Aslan |
3/29/2022 |
Failed: Building - Wall Sheathing |
Marked Red Missing Nails |
Anthony Aslan |
3/29/2022 |
Passed: Building - Roof Decking |
Corrections Made |
Anthony Aslan |
3/31/2022 |
Passed: Building - Wall Sheathing |
Corrections Made |
Anthony Aslan |
3/31/2022 |
Failed: Building - Framing |
Need Stud Packs Under Doubled Truss |
Anthony Aslan |
4/14/2022 |
Passed: Building - Framing |
Corrections Made |
Anthony Aslan |
4/20/2022 |
Failed: Plumbing/Gas - 2nd Rough-In |
R602.6drilling And Notching Of Studs.
drilling And Notching Of Studs Shall Be In Accordance With The Following:
1.notching. Any Stud In An Exterior Wall Or Bearing Partition Shall Be Permitted To Be Cut Or Notched To A Depth Not Exceeding 25 Percent Of Its Width. Studs In Nonbearing Partitions Shall Be Permitted To Be Notched To A Depth Not To Exceed 40 Percent Of A Single Stud Width.
2.drilling. Any Stud Shall Be Permitted To Be Bored Or Drilled, Provided That The Diameter Of The Resulting Hole Is Not More Than 60 Percent Of The Stud Width, The Edge Of The Hole Is Not More Than 5/8 Inch (16 Mm) To The Edge Of The Stud, And The Hole Is Not Located In The Same Section As A Cut Or Notch. Studs Located In Exterior Walls Or Bearing Partitions Drilled Over 40 Percent And Up To 60 Percent Shall Be Doubled With Not More Than Two Successive Doubled Studs Bored. See Figures R602.6(1) And R602.6(2).
|
Anthony Aslan |
6/2/2022 |
Passed: Electrical - 2nd Rough-In |
|
Anthony Aslan |
6/2/2022 |
Failed: Mechanical - Rough In |
M1501.1outdoor Discharge.
the Air Removed By Every Mechanical Exhaust System Shall Be Discharged To The Outdoors In Accordance With Section M1506.3. Air Shall Not Be Exhausted Into An Attic, Soffit, Ridge Vent Or Crawl Space.
m1506.3exhaust Openings.
air Exhaust Openings Shall Terminate Not Less Than 3 Feet (914 Mm) From Property Lines; 3 Feet (914 Mm) From Operable And Nonoperable Openings Into The Building And 10 Feet (3048 Mm) From Mechanical Air Intakes Except Where The Opening Is Located 3 Feet (914 Mm) Above The Air Intake. Openings Shall Comply With Sections R303.5.2 And R303.6.
m1305.1.3appliances In Attics.
attics Containing Appliances Shall Be Provided With An Opening And A Clear And Unobstructed Passageway Large Enough To Allow Removal Of The Largest Appliance, But Not Less Than 30 Inches (762 Mm) High And 22 Inches (559 Mm) Wide And Not More Than 20 Feet (6096 Mm) Long Measured Along The Centerline Of The Passageway From The Opening To The Appliance. The Passageway Shall Have Continuous Solid Flooring In Accordance With Chapter 5 Not Less Than 24 Inches (610 Mm) Wide. A Level Service Space Not Less Than 30 Inches (762 Mm) Deep And 30 Inches (762 Mm) Wide Shall Be Present Along All Sides Of The Appliance Where Access Is Required. The Clear Access Opening Dimensions Shall Be Not Less Than Of 20 Inches By 30 Inches (508 Mm By 762 Mm), And Large Enough To Allow Removal Of The Largest Appliance. |
Anthony Aslan |
6/2/2022 |
Passed: Mechanical - Rough In |
Check Bath Vent At Final Location |
Anthony Aslan |
6/7/2022 |
Passed: Plumbing/Gas - 2nd Rough-In |
Need Letter For Stud With T Brace. |
Anthony Aslan |
6/7/2022 |
Passed: Building - Insulation |
|
Anthony Aslan |
6/13/2022 |
Passed: Electrical - Permanent Power |
Need Septic Release |
Anthony Aslan |
11/16/2022 |
Release to power company |
|
Melissa Garber |
11/30/2022 |
Septic Release Inspection |
|
Health Dept |
11/30/2022 |
Passed: Building - Final |
Need Breaker Lock Out On A/c Breaker, Seal Tight On Wall And Duct Wire Outside, Fresh Air |
Anthony Aslan |
12/20/2022 |
Certificate-Release Certificate |
Rec'cd Pictures Of Corrections |
Anthony Aslan |
1/5/2023 |