Permit Details

Permit Search

Permit

New Residential Construction

764 SW HEFLIN AVE
FORT WHITE, FL 32038

Permit #
000042610
Application #
49849
Status Completed
  1. Submitted Jul 18, 2021
  2. Issued Aug 24, 2021
  3. Expires Aug 28, 2022
  4. Completed Mar 7, 2022

Property

Parcel #
10058-676
Owner
Marrero Hector & Robles Iris
Acres
2.43
Subdivision
Santa Fe River Plantations Replat Of Lots 38,45,46
Zoning
A-3
Flood zone
X
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Engineers Elevation Letter
Finished floor requirement
65.40'
Requirement needed
By Nailing Inspection
Document needed is
a Surveyor letter giving the Finished Floor Elevation
Document receieved
Yes
Fema map number
12023C0532C
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
50
Setback Side 1
50
Setback Side 2
50
Setbacks Rear
50
Stories
1
Heated Area (Sqft)
1407
Total Area (Sqft)
2213
Building Height
21.66
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
21-0608
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.

Status & Review History

  1. Application pending.
  2. Point Review - Printed-Online Application
  3. Zoning Review - Reviewed
  4. Plan Review - Plumbing Approved
  5. Plan Review - Mechanical Approved
  6. Plan Review - Electrical Approved
  7. Plan Review - Building Approved
  8. Plan Review - Reviewed
  9. Zoning Review - Reviewed
  10. Final Review - Documents Required
  11. Zoning Review - Reviewed
  12. Final Review - Payment Needed
  13. Permit Issued
  14. Final Review - Payment Needed

Contractors

  • Corey J Amira

    Amira Custom Homes, Inc.

    License
    CRC1331309
    Title
    Cert. Residential
    Role
    Contractor
  • James Butler Jr

    Butler Plumbing Of Gainesville Inc

    License
    CFC057960
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Benjamin T Keeler

    Keeler Roofing, Llc

    License
    CCC1330509
    Title
    Cert. Roofing
    Role
    Subcontractor
  • Ryan C Beville

    Rbi Electrical Contracting Llc

    License
    EC13004236
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Robert M Bounds

    Bounds Heating & Air Inc

    License
    CAC057642
    Title
    Class A A/c
    Role
    Subcontractor

Inspections

  1. Aug 25, 2021

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Anthony Aslan

  2. Sep 8, 2021

    Passed: Building - Monolithic Slab

    Inspected by Anthony Aslan

  3. Sep 8, 2021

    Passed: Engineering - Setbacks

    Inspected by Anthony Aslan

  4. Sep 10, 2021

    Cancelled: Building - Monolithic Slab

    Inspected by Troy Crews

  5. Sep 10, 2021

    Cancelled: Engineering - Setbacks

    Inspected by Troy Crews

  6. Sep 10, 2021

    Cancelled: Electrical - 1st Underground Rough–In

    Inspected by Troy Crews

  7. Sep 10, 2021

    Passed: Electrical - Temporary Service

    Inspected by Troy Crews

  8. Sep 10, 2021

    Release to power company

    Inspected by Troy Crews

  9. Sep 24, 2021

    Cancelled: Building - Ext Strapping/Wall Sheathing

    Inspected by Anthony Aslan

  10. Sep 27, 2021

    Passed: Building - Ext Strapping/Wall Sheathing

    Inspected by Anthony Aslan

  11. Sep 27, 2021

    Passed: Building - Roof Decking

    Inspected by Anthony Aslan

  12. Oct 14, 2021

    Passed: Building - Framing

    Inspected by Anthony Aslan

  13. Oct 14, 2021

    Passed: Building - Strapping

    Inspected by Anthony Aslan

  14. Oct 14, 2021

    Passed: Electrical - 2nd Rough-In

    Inspected by Anthony Aslan

  15. Oct 14, 2021

    Passed: Mechanical - Rough In

    Inspected by Anthony Aslan

  16. Oct 14, 2021

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Anthony Aslan

  17. Oct 14, 2021

    Passed: Plumbing/Gas - Tub Set/Shower Pan

    Inspected by Anthony Aslan

  18. Oct 29, 2021

    Passed: Building - Insulation

    Inspected by Anthony Aslan

  19. Jan 4, 2022

    Passed: Electrical - Permanent Power

    Need Septic Release And Driveway Release

    Inspected by Anthony Aslan

  20. Mar 1, 2022

    Passed: Building - Final

    Inspected by Anthony Aslan

  21. Mar 4, 2022

    Release to power company

    Septic Rec'd-- Will Run Report On Monday

    Inspected by Melissa Garber

  22. Mar 7, 2022

    Certificate-Release Certificate

    Rec'd Docs

    Inspected by Anthony Aslan

  23. Mar 7, 2022

    Septic Release Inspection

    Inspected by Health Dept

Documents