Inspection |
Notes |
Performed By |
Date |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
10/13/2021 |
Passed: Building - Monolithic Slab |
Install Footer Steel Ground Wire Prior To Pour. |
Troy Crews |
10/18/2021 |
Passed: Engineering - Setbacks |
|
Troy Crews |
10/18/2021 |
Passed: Electrical - Temporary Service |
|
Anthony Aslan |
11/4/2021 |
Release to power company |
|
Anthony Aslan |
11/4/2021 |
Passed: Building - Roof Decking |
|
Troy Crews |
12/1/2021 |
Passed: Building - Wall Sheathing |
|
Troy Crews |
12/1/2021 |
Failed: Electrical - 2nd Rough-In |
Not Complete |
Troy Crews |
1/24/2022 |
Failed: Building - Framing |
Strap Missing At Front Door Header. |
Troy Crews |
1/24/2022 |
Failed: Building - Framing |
6 Ft 8 Inch Head Clearance Not Available At Bottom Step Of Stairs, Also Need Letter From Owner On Fixed Window In Bonus Room That No Bedroom Allowed In This Space |
Troy Crews |
3/1/2022 |
Passed: Electrical - 2nd Rough-In |
|
Troy Crews |
3/1/2022 |
Failed: Mechanical - Rough In |
Dryer Duct Not Installed |
Troy Crews |
3/1/2022 |
Failed: Plumbing/Gas - 2nd Rough-In |
2 Inch Line Cut Off At Slab Dryer Area Needs Cap Glued On. Also Need New Sub Form For Plumber Barrs Not Contractor |
Troy Crews |
3/1/2022 |
Passed: Electrical - Temporary Service |
Already Done 11-21 |
Troy Crews |
3/1/2022 |
Release to power company |
|
Troy Crews |
3/1/2022 |
Passed: Mechanical - Rough In |
Dryer Vent Installed |
Troy Crews |
3/9/2022 |
Passed: Plumbing/Gas - 2nd Rough-In |
New Sub Form Received, Pipe Was Chase For Water Line Incoming. |
Troy Crews |
3/9/2022 |
Septic Release Inspection |
|
Health Dept |
3/29/2022 |
Passed: Building - Insulation |
|
Troy Crews |
4/1/2022 |
Failed: Electrical - Permanent Power |
Need Door Locks. |
Troy Crews |
7/5/2022 |
Passed: Electrical - Permanent Power |
Locks Installed |
Troy Crews |
7/8/2022 |
Release to power company |
|
Troy Crews |
7/8/2022 |
Failed: Building - Final |
House Locked, Dryer Vent Not Complete, Bath Fan Outlets In Soffit Need Grills, Cover Power Ditch In Yard.remainder To Be Inspected When Access Granted. |
Troy Crews |
8/17/2022 |
Certificate-Release Certificate |
Blower Door Received |
Troy Crews |
8/22/2022 |
Passed: Building - Final |
Knee Blower Door Test For Release |
Troy Crews |
8/22/2022 |