Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
Mccormick, David |
8/23/2021 |
Passed: Building - Footer |
Need Ground Wire On Footer Steel Prior To Pour |
Troy Crews |
9/14/2021 |
Passed: Engineering - Setbacks |
Confirm With Surveyor |
Troy Crews |
9/14/2021 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Anthony Aslan |
11/12/2021 |
Passed: Building - Slab |
|
Anthony Aslan |
11/17/2021 |
Passed: Building - Wall Sheathing |
|
Anthony Aslan |
12/20/2021 |
Passed: Building - Roof Decking |
Roof Eyebrow Over Garage Missing Nails |
Anthony Aslan |
12/20/2021 |
Passed: Building - Framing |
Missing Anchor Bolts At Bottom Plate Splice |
Anthony Aslan |
1/11/2022 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Anthony Aslan |
2/10/2022 |
Failed: Mechanical - Rough In |
Gasket Missing On Some Supply Boots, Exhaust Vent Piping Can Not Be Within 3'ft Of Operable And Non-operable Openings To House, |
Anthony Aslan |
2/10/2022 |
Passed: Electrical - 2nd Rough-In |
Service Wire Exterior Wall Top Plate Notched More Than 50% Of Bearing Top Plate. |
Anthony Aslan |
2/10/2022 |
Passed: Mechanical - Rough In |
Corrections Made |
Anthony Aslan |
2/17/2022 |
Passed: Building - Insulation |
|
Anthony Aslan |
3/1/2022 |
Passed: Engineering - Final Driveway |
Inspection Was Made Only Of The Construction Of The Culvert And Related Concrete Work. Inspection Did Not Include The Surface Water Management System, Ditch Work, Slopes, Elevations, Or Any Other Matter Concerning Drainage At Or Around The Subject Property. This Document Shall Not Be Construed To Reflect Any Opinion Of The Inspector Other Than The Construction Of The Culvert In Accordance With The Permit. |
Smith, Blake |
6/1/2022 |
Septic Release Inspection |
|
Health Dept |
6/2/2022 |
Rescheduled 6/7/2022:Building - Final |
|
Anthony Aslan |
6/3/2022 |
Cancelled: Building - Final |
|
Matt Forsyth |
6/6/2022 |
Cancelled: Building - Final |
|
Anthony Aslan |
6/15/2022 |
Passed: Electrical - Permanent Power |
|
Anthony Aslan |
6/15/2022 |
Release to power company |
|
Anthony Aslan |
6/15/2022 |
Passed: Building - Final |
|
Anthony Aslan |
7/28/2022 |