6/23/2021
|
Application pending.
|
6/30/2021
|
Point Review - Status Cleared
|
7/29/2021
|
Point Review - Printed-Online Application
|
7/29/2021
|
Point Review - Reviewed
|
8/4/2021
|
Zoning Review - Reviewed
IF MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED. THERE IS A SIGNIFICANT DIFFERENCE IN ELEVATION AT THE ROAD COMPARED TO THE ELEVATION AT THE HOMESITE. (SHOWN ON LIDAR IN DOCUMENTS)
|
8/9/2021
|
Plan Review - Plumbing Approved
IF MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED. THERE IS A SIGNIFICANT DIFFERENCE IN ELEVATION AT THE ROAD COMPARED TO THE ELEVATION AT THE HOMESITE. (SHOWN ON LIDAR IN DOCUMENTS)
|
8/9/2021
|
Plan Review - Mechanical Approved
IF MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED. THERE IS A SIGNIFICANT DIFFERENCE IN ELEVATION AT THE ROAD COMPARED TO THE ELEVATION AT THE HOMESITE. (SHOWN ON LIDAR IN DOCUMENTS)
|
8/9/2021
|
Plan Review - Electrical Approved
IF MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED. THERE IS A SIGNIFICANT DIFFERENCE IN ELEVATION AT THE ROAD COMPARED TO THE ELEVATION AT THE HOMESITE. (SHOWN ON LIDAR IN DOCUMENTS)
|
8/9/2021
|
Plan Review - Building Approved
IF MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED. THERE IS A SIGNIFICANT DIFFERENCE IN ELEVATION AT THE ROAD COMPARED TO THE ELEVATION AT THE HOMESITE. (SHOWN ON LIDAR IN DOCUMENTS)
|
8/9/2021
|
Plan Review - Reviewed
IF MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED. THERE IS A SIGNIFICANT DIFFERENCE IN ELEVATION AT THE ROAD COMPARED TO THE ELEVATION AT THE HOMESITE. (SHOWN ON LIDAR IN DOCUMENTS)
|
8/11/2021
|
Zoning Review - Reviewed
IF MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED. THERE IS A SIGNIFICANT DIFFERENCE IN ELEVATION AT THE ROAD COMPARED TO THE ELEVATION AT THE HOMESITE. (SHOWN ON LIDAR IN DOCUMENTS)
|
8/12/2021
|
Final Review - Documents Required
IF MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED. THERE IS A SIGNIFICANT DIFFERENCE IN ELEVATION AT THE ROAD COMPARED TO THE ELEVATION AT THE HOMESITE. (SHOWN ON LIDAR IN DOCUMENTS)
CERTIFICATE OF LIABILITY NEEDED - D & S ELECTRIC
ADD ENGINEER NAME & ADDRESS
|
8/16/2021
|
Final Review - Payment Needed
IF MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED. THERE IS A SIGNIFICANT DIFFERENCE IN ELEVATION AT THE ROAD COMPARED TO THE ELEVATION AT THE HOMESITE. (SHOWN ON LIDAR IN DOCUMENTS)
|
8/16/2021
|
Permit Issued
Permit #000042562 created and approved.
|
4/21/2022
|
Final Review - Payment Needed
IF MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED. THERE IS A SIGNIFICANT DIFFERENCE IN ELEVATION AT THE ROAD COMPARED TO THE ELEVATION AT THE HOMESITE. (SHOWN ON LIDAR IN DOCUMENTS)
|