Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
Mccormick, David |
8/3/2021 |
Passed: Building - Footer |
Confirm Setbacks With Surveyor |
Troy Crews |
9/9/2021 |
Passed: Engineering - Setbacks |
Confirm Setbacks With Surveyor |
Troy Crews |
9/9/2021 |
Passed: Electrical - 1st Underground Rough–In |
|
Anthony Aslan |
10/6/2021 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Anthony Aslan |
10/6/2021 |
Passed: Building - Slab |
|
Anthony Aslan |
10/13/2021 |
Passed: Building - Roof Decking |
|
Anthony Aslan |
11/15/2021 |
Passed: Building - Wall Sheathing |
Two Spots On Back Porch Red Marker |
Anthony Aslan |
11/15/2021 |
Failed: Building - Framing |
Girder Trusses Need Dttz W/ Anchors
t16 Single Stud Pack At Back Wall |
Anthony Aslan |
12/1/2021 |
Failed: Building - Framing |
T26 Girder Needs Anchoring & Stud Pack Under Girders, T16 Still Not Corrected, T07 With Red Marker Needs Truss Repair Truss Up Right Cracker All The Way Through. |
Anthony Aslan |
12/9/2021 |
Passed: Building - Framing |
Corrections Made |
Anthony Aslan |
12/16/2021 |
Passed: Electrical - 2nd Rough-In |
|
Anthony Aslan |
1/3/2022 |
Passed: Plumbing/Gas - 2nd Rough-In |
No Water In Tub |
Anthony Aslan |
1/3/2022 |
Failed: Mechanical - Rough In |
Return In Kitchen Is Less Than 10'ft From Stove.
m1602.2return Air Openings.
return Air Openings For Heating, Ventilation And Air Conditioning Systems Shall Comply With All Of The Following:
1.openings Shall Not Be Located Less Than 10 Feet (3048 Mm) Measured In Any Direction From An Open Combustion Chamber Or Draft Hood Of Another Appliance Located In The Same Room Or Space.
2.the Amount Of Return Air Taken From Any Room Or Space Shall Be Not Greater Than The Flow Rate Of Supply Air Delivered To Such Room Or Space.
3.return And Transfer Openings Shall Be Sized In Accordance With The Appliance Or Equipment Manufacturers’ Installation Instructions, Manual D Or The Design Of The Registered Design Professional.
4.return Air Shall Not Be Taken From A Closet, Bathroom, Toilet Room, Kitchen, Garage, Mechanical Room, Boiler Room, Furnace Room Or Unconditioned Attic.
exceptions:
1.taking Return Air From A Kitchen Is Not Prohibited Where Such Return Air Openings Serve The Kitchen Only, And Are Located Not Less Than 10 Feet (3048 Mm) From The Cooking Appliances |
Anthony Aslan |
1/3/2022 |
Passed: Mechanical - Rough In |
Correction Made |
Anthony Aslan |
1/6/2022 |
Passed: Building - Insulation |
|
Anthony Aslan |
1/13/2022 |
Passed: Engineering - Final Driveway |
Inspection Was Made Only Of The Construction Of The Culvert And Related Concrete Work. Inspection Did Not Include The Surface Water Management System, Ditch Work, Slopes, Elevations, Or Any Other Matter Concerning Drainage At Or Around The Subject Property. This Document Shall Not Be Construed To Reflect Any Opinion Of The Inspector Other Than The Construction Of The Culvert In Accordance With The Permit. |
Smith, Blake |
6/1/2022 |
Septic Release Inspection |
|
Health Dept |
6/2/2022 |
Rescheduled 6/7/2022:Building - Final |
|
Anthony Aslan |
6/3/2022 |
Cancelled: Building - Final |
|
Matt Forsyth |
6/6/2022 |
Cancelled: Building - Final |
|
Anthony Aslan |
6/15/2022 |
Passed: Electrical - Permanent Power |
|
Anthony Aslan |
6/15/2022 |
Release to power company |
|
Anthony Aslan |
6/15/2022 |
Passed: Building - Final |
Water Heater Not Wired Up, A/c Chase Needs To Be Sealed, Service Caps Missing On Condenser And Service Port Locking Caps |
Anthony Aslan |
7/14/2022 |
Certificate-Release Certificate |
Rec'vd Pictures |
Anthony Aslan |
7/15/2022 |