Inspection |
Notes |
Performed By |
Date |
Passed: Building - Footer |
|
Troy Crews |
8/20/2021 |
Passed: Engineering - Setbacks |
Need To Be Confirmed By Surveyor |
Troy Crews |
8/20/2021 |
Passed: Building - Footer |
|
Troy Crews |
9/10/2021 |
Passed: Engineering - Setbacks |
Shifted House To The Rear Of Lot To Meet Setbacks |
Troy Crews |
9/10/2021 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
9/24/2021 |
Passed: Building - Slab |
|
Troy Crews |
10/5/2021 |
Passed: Building - Roof Decking |
|
Troy Crews |
10/28/2021 |
Passed: Building - Wall Sheathing |
|
Troy Crews |
10/28/2021 |
Failed: Building - Framing |
No Porch Post Strapping, No Anchor Bolts, Not Complete Overall. |
Troy Crews |
11/2/2021 |
Failed: Electrical - 2nd Rough-In |
No Wiring Done. |
Troy Crews |
11/2/2021 |
Failed: Mechanical - Rough In |
No Mechanical Done. |
Troy Crews |
11/2/2021 |
Failed: Plumbing/Gas - 2nd Rough-In |
No Plumbing Ready. |
Troy Crews |
11/2/2021 |
Failed: Mechanical - Rough In |
Bath Fan Ducts Disconnected And Short At Soffit Call Back In With Insulation. |
Troy Crews |
11/16/2021 |
Passed: Building - Ext Strapping/Wall Sheathing |
|
Troy Crews |
11/16/2021 |
Passed: Building - Framing |
|
Troy Crews |
11/16/2021 |
Passed: Building - Strapping |
|
Troy Crews |
11/16/2021 |
Passed: Building - Wall Sheathing |
|
Troy Crews |
11/16/2021 |
Passed: Electrical - 2nd Rough-In |
|
Troy Crews |
11/16/2021 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Troy Crews |
11/16/2021 |
Passed: Building - Insulation |
Bath Fan Duct Not Repaired Need Inspection Before Drywall, Mechanical |
Troy Crews |
11/29/2021 |
Passed: Electrical - Permanent Power |
|
Troy Crews |
2/18/2022 |
Release to power company |
|
Troy Crews |
2/18/2022 |
Failed: Building - Final |
No One Home Owner Needs To Be On Site For Inspection Belongings Are In The House |
Troy Crews |
8/23/2022 |
Passed: Building - Final |
|
Troy Crews |
8/30/2022 |
(Requested) Building-Masonry Wall Reinforcing |
|
|
|