Inspection |
Notes |
Performed By |
Date |
Passed: Building - Footer |
|
Matt Forsyth |
8/31/2021 |
Passed: Engineering - Setbacks |
|
Matt Forsyth |
8/31/2021 |
Passed: Electrical - Temporary Service |
|
Matt Forsyth |
8/31/2021 |
Release to power company |
|
Matt Forsyth |
8/31/2021 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Matt Forsyth |
10/7/2021 |
Passed: Engineering - Setbacks |
|
Matt Forsyth |
10/13/2021 |
Passed: Building - Slab |
|
Matt Forsyth |
10/13/2021 |
Cancelled: Building - Footer |
|
Matt Forsyth |
10/13/2021 |
Passed: Building - Roof Decking |
|
Matt Forsyth |
11/10/2021 |
Passed: Building - Wall Sheathing |
Gable Strapping Was Included |
Matt Forsyth |
11/10/2021 |
Passed: Engineering - Initial Driveway |
|
Smith, Blake |
1/25/2022 |
Passed: Building - Framing |
|
Matt Forsyth |
1/26/2022 |
Failed: Electrical - 2nd Rough-In |
Missing Carbon Monoxide Detectors |
Matt Forsyth |
1/26/2022 |
Passed: Mechanical - Rough In |
|
Matt Forsyth |
1/26/2022 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Matt Forsyth |
1/26/2022 |
Passed: Electrical - 2nd Rough-In |
Item Addressed |
Matt Forsyth |
1/28/2022 |
Passed: Building - Insulation |
Walls And Vaulted Ceiling |
Matt Forsyth |
2/3/2022 |
Failed: Building - Footer |
No Work Done On Barn |
Matt Forsyth |
3/29/2022 |
Failed: Engineering - Setbacks |
|
Matt Forsyth |
3/29/2022 |
Passed: Building - Footer |
Pole Barn Posts Only |
Matt Forsyth |
4/11/2022 |
Passed: Engineering - Setbacks |
|
Matt Forsyth |
4/11/2022 |
Passed: Building - Monolithic Slab |
|
Matt Forsyth |
5/11/2022 |
Passed: Engineering - Setbacks |
|
Matt Forsyth |
5/11/2022 |
Failed: Electrical - Permanent Power |
Need Conduit Run To Transformer Also Driveway Permit Complete |
Matt Forsyth |
7/29/2022 |
Passed: Engineering - Final Driveway |
|
Smith, Blake |
8/2/2022 |
Passed: Electrical - Permanent Power |
Need Septic Release |
Matt Forsyth |
8/9/2022 |
Passed: Building - Wall Sheathing |
Pole Barn |
Matt Forsyth |
8/17/2022 |
Release to power company |
|
Melissa Garber |
9/16/2022 |
Septic Release Inspection |
|
Health Dept |
9/16/2022 |
Cancelled: Building - Final |
|
Matt Forsyth |
9/20/2022 |
Failed: Building - Final |
Several Things Need To Be Finished In The Home Electrical Work And Appliances Also Blower Door Test
|
Matt Forsyth |
9/21/2022 |
Passed: Building - Final |
|
Matt Forsyth |
10/26/2022 |