Permit Details

Permit Search

Permit

New Residential Construction

504 SW VIXEN LANE
FORT WHITE, FL 32038

Permit #
000042375
Application #
49529
Status Completed
  1. Submitted Jun 16, 2021
  2. Issued Jul 21, 2021
  3. Expires Apr 24, 2023
  4. Completed Oct 26, 2022

Property

Parcel #
03951-137
Owner
Speicher Dale A
Acres
5.01
Subdivision
Foxwood Phase 2
Zoning
A-3
Flood zone
X
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Engineers Elevation Letter
Finished floor requirement
68.5'
Requirement needed
By Nailing Inspection
Document needed is
a Surveyor letter giving the Finished Floor Elevation
Document receieved
Yes
Fema map number
12023C0490C
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
30
Setback Side 1
25
Setback Side 2
25
Setbacks Rear
25
Stories
1
Heated Area (Sqft)
1730
Total Area (Sqft)
2454
Building Height
16
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
21-0544
If Other, explain the use of the structure.
14X28 aluminum screened enclosure and 48' X 48' pole barn with 576 sq/ft area enclosed/sided for storage
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.

Status & Review History

  1. Application pending.
  2. Point Review - Printed-Online Application
  3. Point Review - Reviewed
  4. Zoning Review - Corrections Needed
  5. Plan Review - Plumbing Approved
  6. Plan Review - Plumbing Approved
  7. Plan Review - Mechanical Approved
  8. Plan Review - Electrical Approved
  9. Plan Review - Building Approved
  10. Plan Review - Reviewed
  11. Zoning Review - Reviewed
  12. Zoning Review - Reviewed
  13. Final Review - Reviewed
  14. Final Review - Payment Needed
  15. Permit Issued
  16. Zoning Review - Reviewed
  17. Final Review - Contact the Building Dept
  18. Final Review - Payment Needed

Contractors

  • James Butler Jr

    Butler Plumbing Of Gainesville Inc

    License
    CFC057960
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Paula E Kennedy

    Gainesville Roofing & Co Inc

    License
    CCC1328678
    Title
    Cert. Roofing
    Role
    Subcontractor

    County License & State License & Workers Comp Expired.

  • Jack E Spann Jr

    Creative Designs Electric Lllp

    License
    ER0004625
    Title
    Reg. Electrical
    Role
    Subcontractor

    County License & State License & Workers Comp Expired.

  • Allen Strickland

    Wade Custom Homes Inc

    License
    CRC1332956
    Title
    Cert. Residential
    Role
    Contractor

    County License & State License & Employees Workers Comp Expired.

  • Jonathan E Spann

    Spann's Heating & Air Conditioning Inc

    License
    CAC1815959
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

    County License & State License & Liability Insurance & Workers Comp Expired.

Inspections

  1. Aug 31, 2021

    Passed: Building - Footer

    Inspected by Matt Forsyth

  2. Aug 31, 2021

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  3. Aug 31, 2021

    Passed: Electrical - Temporary Service

    Inspected by Matt Forsyth

  4. Aug 31, 2021

    Release to power company

    Inspected by Matt Forsyth

  5. Oct 7, 2021

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Matt Forsyth

  6. Oct 13, 2021

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  7. Oct 13, 2021

    Passed: Building - Slab

    Inspected by Matt Forsyth

  8. Oct 13, 2021

    Cancelled: Building - Footer

    Inspected by Matt Forsyth

  9. Nov 10, 2021

    Passed: Building - Roof Decking

    Inspected by Matt Forsyth

  10. Nov 10, 2021

    Passed: Building - Wall Sheathing

    Gable Strapping Was Included

    Inspected by Matt Forsyth

  11. Jan 26, 2022

    Passed: Building - Framing

    Inspected by Matt Forsyth

  12. Jan 26, 2022

    Failed: Electrical - 2nd Rough-In

    Missing Carbon Monoxide Detectors

    Inspected by Matt Forsyth

  13. Jan 26, 2022

    Passed: Mechanical - Rough In

    Inspected by Matt Forsyth

  14. Jan 26, 2022

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Matt Forsyth

  15. Jan 28, 2022

    Passed: Electrical - 2nd Rough-In

    Item Addressed

    Inspected by Matt Forsyth

  16. Feb 3, 2022

    Passed: Building - Insulation

    Walls And Vaulted Ceiling

    Inspected by Matt Forsyth

  17. Mar 29, 2022

    Failed: Building - Footer

    No Work Done On Barn

    Inspected by Matt Forsyth

  18. Mar 29, 2022

    Failed: Engineering - Setbacks

    Inspected by Matt Forsyth

  19. Apr 11, 2022

    Passed: Building - Footer

    Pole Barn Posts Only

    Inspected by Matt Forsyth

  20. Apr 11, 2022

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  21. May 11, 2022

    Passed: Building - Monolithic Slab

    Inspected by Matt Forsyth

  22. May 11, 2022

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  23. Jul 29, 2022

    Failed: Electrical - Permanent Power

    Need Conduit Run To Transformer Also Driveway Permit Complete

    Inspected by Matt Forsyth

  24. Aug 9, 2022

    Passed: Electrical - Permanent Power

    Need Septic Release

    Inspected by Matt Forsyth

  25. Aug 17, 2022

    Passed: Building - Wall Sheathing

    Pole Barn

    Inspected by Matt Forsyth

  26. Sep 16, 2022

    Release to power company

    Inspected by Melissa Garber

  27. Sep 16, 2022

    Septic Release Inspection

    Inspected by Health Dept

  28. Sep 20, 2022

    Cancelled: Building - Final

    Inspected by Matt Forsyth

  29. Sep 21, 2022

    Failed: Building - Final

    Several Things Need To Be Finished In The Home Electrical Work And Appliances Also Blower Door Test

    Inspected by Matt Forsyth

  30. Oct 26, 2022

    Passed: Building - Final

    Inspected by Matt Forsyth

Documents