Permit Details

Permit Search

Permit

Mobile Home

295 NE BURBANK TER
LAKE CITY, FL 32055

Permit #
000042370
Application #
49314
Status Completed
  1. Submitted Jun 6, 2022
  2. Issued Jul 20, 2021
  3. Expires Jun 4, 2023
  4. Completed Dec 6, 2022

Property

Parcel #
07337-000
Owner
Jones Valerie
Acres
0.77
Subdivision
Alexandra Heights
Zoning
I
Flood zone
X
District
1

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0305D
In floodway
N
Mobile Home is a:
Double Wide
Year Built
1998
Width (Ft.In)
28
Length (Ft.In)
52
Driveway access to home:
Existing Drive
Installation Decal #
81748
Septic #
21-0366
Setbacks Front
20'
Setback Side 1
15'
Setbacks Rear
15'
Dev Permit #
F023-
Setback Side 2
15'
Are you applying for a 5 year temporary permit?
No
Serial #
flflw79ab13453he21 4523a
Wind Zone?
2
Residential or Commercial Use?
Residential

Status & Review History

  1. Plan Review - Reviewed
  2. Zoning Review - On Hold-Incomplete
  3. Zoning Review - Reviewed
  4. Final Review - Documents Required
  5. Point Review - Reviewed
  6. Final Review - Documents Required
  7. Permit Issued

Contractors

  • Damarquis A Williams

    License
    IH1128217
    Title
    Mh Installer (ih)
    Role
    Contractor

    County License & State License Expired.

Inspections

  1. Jun 1, 2021

    Rescheduled 6/4/2021:Mobile Home - In County Pre-Mobile Home before set-up

    Inspected by Janice Williams

  2. Jun 4, 2021

    Passed: Mobile Home - In County Pre-Mobile Home before set-up

    Zone 2 Under Kitchen Sink, Repair Window, Holes In Wall Etc. Before Final

    Inspected by Troy Crews

  3. Sep 10, 2021

    Septic Release Inspection

    Inspected by Health Dept

  4. Sep 16, 2021

    Rescheduled 9/17/2021:Mobile Home - Mobile Home Set-Up Final

    Inspected by Troy Crews

  5. Sep 16, 2021

    Rescheduled 9/17/2021:Engineering - Setbacks

    Inspected by Troy Crews

  6. Sep 17, 2021

    Failed: Mobile Home - Mobile Home Set-Up Final

    Wiring Not Complete

    Inspected by Troy Crews

  7. Sep 17, 2021

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  8. Jun 6, 2022

    Failed: Mobile Home - Mobile Home Set-Up Final

    Not Complete

    Inspected by Troy Crews

  9. Jun 6, 2022

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  10. Jun 10, 2022

    Failed: Mobile Home - Mobile Home Set-Up Final

    Weatherhead On Power Pole Not In Place. Also Siding Not Complete.

    Inspected by Troy Crews

  11. Jun 10, 2022

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  12. Sep 14, 2022

    Failed: Mobile Home - Mobile Home Set-Up Final

    Need To Put Weatherhead Back In Place, Also Install Ground Rod And Hook Up.

    Inspected by Troy Crews

  13. Sep 14, 2022

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  14. Dec 6, 2022

    Passed: Mobile Home - Mobile Home Set-Up Final

    Final To Complete Repairs

    Inspected by Troy Crews

  15. Dec 6, 2022

    Release to power company

    Inspected by Troy Crews

  16. Dec 6, 2022

    Passed: Engineering - Setbacks

    Inspected by Troy Crews