Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
Mccormick, David |
7/14/2021 |
Passed: Building - Footer |
|
Anthony Aslan |
7/21/2021 |
Passed: Engineering - Setbacks |
Tight Lot Lines |
Anthony Aslan |
7/21/2021 |
Passed: Electrical - 1st Underground Rough–In |
|
Anthony Aslan |
8/13/2021 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Anthony Aslan |
8/13/2021 |
Cancelled: Building - Slab |
|
Anthony Aslan |
8/26/2021 |
Passed: Building - Slab |
|
Anthony Aslan |
8/30/2021 |
Passed: Building - Roof Decking |
|
Anthony Aslan |
9/29/2021 |
Failed: Building - Wall Sheathing |
Red Marker Marking Missing Nails |
Anthony Aslan |
9/29/2021 |
Passed: Building - Wall Sheathing |
Left Side Window With X Missing Nails. |
Anthony Aslan |
10/4/2021 |
Passed: Building - Framing |
Check Anchor Bolts |
Anthony Aslan |
10/13/2021 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Anthony Aslan |
12/3/2021 |
Failed: Electrical - 2nd Rough-In |
Service Feed More Than 50% Hole On Top Plate Need Reinforced Strap |
Anthony Aslan |
12/3/2021 |
Failed: Mechanical - Rough In |
Master Closet Boot Missing Gasket, Dryer Vent More Than 50% Top Plate Need Re-enforced Strap |
Anthony Aslan |
12/3/2021 |
Passed: Electrical - 2nd Rough-In |
|
Anthony Aslan |
12/9/2021 |
Passed: Mechanical - Rough In |
|
Anthony Aslan |
12/9/2021 |
Passed: Building - Insulation |
|
Anthony Aslan |
12/10/2021 |
Passed: Engineering - Final Driveway |
|
Smith, Blake |
2/17/2022 |
Release to power company |
Septic Rec'd-- Will Run Report Monday |
Melissa Garber |
3/4/2022 |
Passed: Electrical - Permanent Power |
Need Septic Release |
Anthony Aslan |
3/4/2022 |
Septic Release Inspection |
|
Health Dept |
3/7/2022 |
Passed: Building - Final |
Need Picture Of Straps And Locking Caps On A/c Condenser |
Anthony Aslan |
4/14/2022 |