Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Additions Permit

Address 12518 S US HIGHWAY 441
LAKE CITY, FL 32025
Parcel #: 09419-102
Acres: 5.00
Owner: The Cross Church Of Columbia Inc
Subdivision:
Zoning: A-3
Flood Zone: X
District: 4
Application #: 49875
Permit #: 000042317
Related Permit:
Submitted:
Issued: Tuesday, July 13, 2021
Expires: Monday, December 20, 2021
Completed: Monday, December 20, 2021
Status: Completed
Septic Release? Yes
Notes:
SITE & DEVELOPMENT PLAN 2105 APPROVED
Job Details
Elevation regulation Minimum Requirement
Finished floor requirement Meet existing structure
Fema map number 12023C0415C
Description of addition: AUDITORIUM ADDITION
Select driveway access to property: Existing Drive
Fire sprinklers? No
Setbacks Front 30'
Setback Side 1 25'
Setback Side 2 25'
Setback Rear 25'
Stories 1
Heated Area (Sqft) 2000
Total Area (Sqft) 2000
Total Estimated Cost 55000
Building Height 17
Building Code Construction Type III
Building Code Element B
Building Code Occupancy Types Assembly
Occupancy Use Title CHURCH
Dev Permit # F023-
Design Occupant Load 134
Building Code Edition 2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000) 21-0606
Is this an addition for commercial or residential use? Commercial
Sealed roof decking options. (Must select one.) Other (explain)
Sealed roof decking explanation for other option. STEEL BUILDING
Review Notes
7/9/2021 Point Review - Received-Hard Copy Application
7/12/2021 Plan Review - Documents Required
7/12/2021 Zoning Review - Reviewed
7/13/2021 Plan Review - Electrical Approved
7/13/2021 Plan Review - Building Approved
7/13/2021 Plan Review - Mechanical Approved
7/13/2021 Plan Review - Reviewed
7/13/2021 Final Review - Processing
7/13/2021 Final Review - Processing
7/13/2021 Final Review - Payment Needed
7/13/2021 Permit Issued
8/5/2021 Point Review - Received-Hard Copy Application
Contractors
Name/ Business License Title Role
Inspections
Inspection Notes Performed By Date
Passed: Fire - Plan Review Jeff Crawford 7/13/2021
Septic Release Inspection Health Dept 7/16/2021
Cancelled: Engineering - Setbacks Melissa Garber 9/1/2021
Cancelled: Building - Footer Melissa Garber 9/1/2021
Passed: Building - Monolithic Slab Troy Crews 9/2/2021
Passed: Engineering - Setbacks Troy Crews 9/2/2021
Passed: Electrical - 2nd Rough-In Troy Crews 11/19/2021
Passed: Building - Above Ceiling Troy Crews 12/16/2021
Passed: Fire - Fire Final Missing Switch And Cover Plate In Triple Gang Box multiple Single Gang Boxes Missing Covers temporary Power Wire Still To Be Removed Lance Hill 12/17/2021
Passed: Building - Final Troy Crews 12/20/2021