Permit Details

Permit Search

Permit

Additions

12518 S US HIGHWAY 441
LAKE CITY, FL 32025

Permit #
000042317
Application #
49875
Status Completed
  1. Submitted —
  2. Issued Jul 13, 2021
  3. Expires Jun 18, 2022
  4. Completed Dec 20, 2021

Property

Parcel #
09419-102
Owner
The Cross Church Of Columbia Inc
Acres
5.00
Subdivision
—
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
Meet existing structure
Fema map number
12023C0415C
Description of addition:
AUDITORIUM ADDITION
Select driveway access to property:
Existing Drive
Fire sprinklers?
No
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setback Rear
25'
Stories
1
Heated Area (Sqft)
2000
Total Area (Sqft)
2000
Total Estimated Cost
55000
Building Height
17
Building Code Construction Type
III
Building Code Element
B
Building Code Occupancy Types
Assembly
Occupancy Use Title
CHURCH
Dev Permit #
F023-
Design Occupant Load
134
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic#
21-0606
Is this an addition for commercial or residential use?
Commercial
Sealed roof decking options. (Must select one.)
Other (explain)
Sealed roof decking explanation for other option.
STEEL BUILDING

Status & Review History

  1. Point Review - Received-Hard Copy Application
  2. Plan Review - Documents Required
  3. Zoning Review - Reviewed
  4. Plan Review - Electrical Approved
  5. Plan Review - Building Approved
  6. Plan Review - Mechanical Approved
  7. Plan Review - Reviewed
  8. Final Review - Processing
  9. Final Review - Processing
  10. Final Review - Payment Needed
  11. Permit Issued
  12. Point Review - Received-Hard Copy Application

Contractors

This is an owner-builder project.

Inspections

  1. Jul 13, 2021

    Passed: Fire - Plan Review

    Inspected by Jeff Crawford

  2. Jul 16, 2021

    Septic Release Inspection

    Inspected by Health Dept

  3. Sep 1, 2021

    Cancelled: Engineering - Setbacks

    Inspected by Melissa Garber

  4. Sep 1, 2021

    Cancelled: Building - Footer

    Inspected by Melissa Garber

  5. Sep 2, 2021

    Passed: Building - Monolithic Slab

    Inspected by Troy Crews

  6. Sep 2, 2021

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  7. Nov 19, 2021

    Passed: Electrical - 2nd Rough-In

    Inspected by Troy Crews

  8. Dec 16, 2021

    Passed: Building - Above Ceiling

    Inspected by Troy Crews

  9. Dec 17, 2021

    Passed: Fire - Fire Final

    Missing Switch And Cover Plate In Triple Gang Box multiple Single Gang Boxes Missing Covers temporary Power Wire Still To Be Removed

    Inspected by Lance Hill

  10. Dec 20, 2021

    Passed: Building - Final

    Inspected by Troy Crews

Documents