Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 372 SW BLACKPINE TERR
LAKE CITY, FL 32024
Parcel #: 03087-117
Acres: 0.70
Owner: Terry Jones And Denna Freeman
Subdivision: Forest Country Sixth Addition
Zoning: RSF-2
Flood Zone: X
District: 3
Application #: 49579
Permit #: 000042282
Related Permit: Culvert: 000042279
Submitted: Wednesday, June 9, 2021
Issued: Friday, October 1, 2021
Expires: Tuesday, May 31, 2022
Completed: Tuesday, May 31, 2022
Status: Completed
Septic Release? Yes
Notes:
ENGINEERS LETTER STATING MINIMUM FINISHED FLOOR ELEVATION REC'D ELEVEATION CONFIRMATION LETTER REC'D @ 108.49'
Job Details
Elevation regulation Engineers Elevation Letter
Finished floor requirement 106'
Requirement needed By Nailing Inspection
Document needed is a Surveyor letter giving the Finished Floor Elevation
Document receieved Yes
Fema map number 12023C0289D
In floodway N
This is the construction of a Single Family Dwelling
Setbacks Front 25'
Setback Side 1 10'
Setback Side 2 10'
Setbacks Rear 15'
Stories 1
Heated Area (Sqft) 2907
Total Area (Sqft) 4138
Building Height 25
Building Code Occupancy Types Residential
Occupancy Use Title single family dwelling
Building Code Edition 2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000) 21-0474
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition) two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Review Notes
6/9/2021 Application pending.
6/9/2021 Point Review - On Hold-Incomplete
6/11/2021 Point Review - Printed-Online Application
6/11/2021 Point Review - Reviewed
6/14/2021 Zoning Review - Reviewed
6/23/2021 Plan Review - Documents Required
6/23/2021 Plan Review - Documents Required
6/23/2021 Plan Review - Documents Required
7/6/2021 Plan Review - Documents Required
7/7/2021 Plan Review - Plumbing Approved
7/7/2021 Plan Review - Mechanical Approved
7/7/2021 Plan Review - Electrical Approved
7/7/2021 Plan Review - Building Approved
7/7/2021 Plan Review - Reviewed
7/7/2021 Zoning Review - Reviewed
7/8/2021 Final Review - Reviewed
7/8/2021 Final Review - Payment Needed
7/9/2021 Permit Issued
10/1/2021 Permit reissued to reflect updated information.
4/13/2022 Final Review - Payment Needed
Contractors
Name/ Business License Title Role
Josh Sparks
Sparks Construction
CBC1252260 Building Contractor Contractor
Cody Barrs
Barrs Plumbing Inc
CFC1427145 Plumbing Contractor Subcontractor
Ralph W Laverdure
Rwl Roofing,llc.
CCC1328590 Roofing Contractor Subcontractor
Benjamin L Sparks
Line Electric Company Llc
EC13009101 Cert. Electrical Subcontractor
Stephen M Brisbois
Epic Ac Service (dba) Central Home Heating & Air Llc
CAC1819412 Cert. A/c Class “b” Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Initial Driveway Mccormick, David 7/12/2021
Passed: Building - Footer Matt Forsyth 9/21/2021
Passed: Engineering - Setbacks Matt Forsyth 9/21/2021
Passed: Plumbing/Gas - 1st Underground Rough–In Matt Forsyth 10/14/2021
Passed: Building - Slab Troy Crews 11/17/2021
Passed: Building - Roof Decking Matt Forsyth 1/3/2022
Passed: Building - Ext Strapping/Wall Sheathing Matt Forsyth 1/3/2022
Passed: Building - Framing Matt Forsyth 1/3/2022
Passed: Electrical - 2nd Rough-In Matt Forsyth 1/14/2022
Passed: Mechanical - Rough In Matt Forsyth 1/14/2022
Passed: Plumbing/Gas - 2nd Rough-In Tub Was Water Tested Matt Forsyth 1/14/2022
Passed: Building - Insulation Spray Foam Walls And Ceiling Matt Forsyth 2/15/2022
Septic Release Inspection Health Dept 4/13/2022
Passed: Electrical - Permanent Power Need Driveway Release Matt Forsyth 4/14/2022
Passed: Engineering - Final Driveway Smith, Blake 4/20/2022
Cancelled: Engineering - Final Driveway Melissa Garber 4/20/2022
Release to power company Melissa Garber 4/21/2022
Failed: Building - Final Ele Panel Not Labeled , Recpt. In Garage Showing Open Ground, Back Porch Gfci Not Working Also Need Bdt Test Matt Forsyth 5/17/2022
Failed: Building - Final Stove Venting Document Matt Forsyth 5/20/2022
Passed: Building - Final Matt Forsyth 5/31/2022
Documents
File Name Date File Size