Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 970 SW MANDIBA DR
LAKE CITY, FL 32024
Parcel #: 09280-170
Acres: 1.02
Owner: Elliot Karyn D
Subdivision: Oaks Of Lake City Phase 2
Zoning: PRRD
Flood Zone: X
District: 5
Application #: 49116
Permit #: 000042266
Related Permit: Culvert: 000042267
Submitted: Friday, June 4, 2021
Issued: Tuesday, July 6, 2021
Expires: Tuesday, March 22, 2022
Completed: Tuesday, March 22, 2022
Status: Completed
Septic Release? Yes
Notes:
ELEVATION CONFIRMATION LETTER REC'D @ 81.55'-- 8/24/21
Job Details
Elevation regulation Subdivision Plat
Finished floor requirement 78'
Requirement needed By Nailing Inspection
Document needed is a Surveyor letter giving the Finished Floor Elevation
Document receieved Yes
Fema map number 12023C0395C
In floodway N
This is the construction of a Single Family Dwelling
Setbacks Front 30
Setback Side 1 25
Setback Side 2 25
Setbacks Rear 25
Stories 1
Heated Area (Sqft) 2061
Total Area (Sqft) 2983
Building Code Edition 2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000) 20-1035
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition) a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Review Notes
4/23/2021 Application pending.
6/7/2021 Point Review - Printed-Online Application
6/8/2021 Zoning Review - Reviewed
6/16/2021 Plan Review - Reviewed
7/1/2021 Zoning Review - Reviewed
7/1/2021 Final Review - Reviewed
7/6/2021 Permit Issued
2/11/2022 Final Review - Payment Needed
Contractors
Name/ Business License Title Role
Bryan Zecher
Bryan Zecher Homes Inc
CBC1257343 Building Contractor Contractor
Anthony R Franks
Franks & Lane Heating And Air Llc
CAC1818631 Cert. A/c Class “b” Subcontractor
Marcus Matthews
Matthews Electric Llc
EC13005459 Electrical Contractor Subcontractor
Cody Barrs
Barrs Plumbing Inc
CFC1427145 Plumbing Contractor Subcontractor
Robert Ogles Ii
Ogles Roofing & Construction Llc
CCC1328699 Cert Roofing Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Initial Driveway Mccormick, David 7/12/2021
Passed: Building - Footer Troy Crews 7/14/2021
Passed: Engineering - Setbacks Troy Crews 7/14/2021
Passed: Plumbing/Gas - 1st Underground Rough–In Troy Crews 8/26/2021
Cancelled: Building - Monolithic Slab Troy Crews 9/1/2021
Cancelled: Engineering - Setbacks Troy Crews 9/1/2021
Passed: Building - Slab Troy Crews 9/1/2021
Passed: Building - Ext Strapping/Wall Sheathing Troy Crews 10/19/2021
Passed: Building - Framing Troy Crews 10/19/2021
Passed: Building - Roof Decking Troy Crews 10/19/2021
Passed: Electrical - 2nd Rough-In Troy Crews 12/16/2021
Passed: Mechanical - Rough In Troy Crews 12/16/2021
Passed: Plumbing/Gas - 2nd Rough-In Troy Crews 12/16/2021
Passed: Building - Insulation Repair Garage Wall Area Blew Out. Troy Crews 12/20/2021
Passed: Electrical - Permanent Power Need Septic And Drive Wall Troy Crews 2/14/2022
Passed: Engineering - Final Driveway Smith, Blake 2/22/2022
Release to power company Melissa Garber 2/23/2022
Septic Release Inspection Health Dept 2/23/2022
Passed: Building - Final Troy Crews 3/21/2022
Documents