Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
Mccormick, David |
7/2/2021 |
Rescheduled 7/6/2021:Engineering - Initial Driveway |
|
Melissa Garber |
7/2/2021 |
Passed: Electrical - Temporary Service |
|
Troy Crews |
7/14/2021 |
Release to power company |
|
Troy Crews |
7/14/2021 |
Passed: Building - Footer |
|
Troy Crews |
7/14/2021 |
Passed: Engineering - Setbacks |
|
Troy Crews |
7/14/2021 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Matt Forsyth |
8/10/2021 |
Passed: Building - Slab |
Some Block Cells In Garage Need To Be Cleaned Out |
Matt Forsyth |
8/16/2021 |
Failed: Building - Roof Decking |
Roof Sheathing Not Complete |
Matt Forsyth |
11/9/2021 |
Passed: Building - Wall Sheathing |
|
Matt Forsyth |
11/9/2021 |
Passed: Building - Roof Decking |
|
Troy Crews |
11/16/2021 |
Passed: Building - Ext Strapping/Wall Sheathing |
|
Matt Forsyth |
12/2/2021 |
Passed: Building - Framing |
|
Matt Forsyth |
12/2/2021 |
Passed: Building - Strapping |
|
Matt Forsyth |
12/2/2021 |
Passed: Electrical - 2nd Rough-In |
|
Matt Forsyth |
12/2/2021 |
Passed: Mechanical - Rough In |
|
Matt Forsyth |
12/2/2021 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Matt Forsyth |
12/2/2021 |
Passed: Plumbing/Gas - Tub Set/Shower Pan |
Tub Water Tested |
Matt Forsyth |
12/2/2021 |
Passed: Building - Insulation |
Walls And Ceiling |
Matt Forsyth |
12/28/2021 |
Passed: Electrical - Permanent Power |
Need Septic And Driveway |
Matt Forsyth |
4/11/2022 |
Release to power company |
|
Melissa Garber |
4/19/2022 |
Passed: Engineering - Final Driveway |
|
Smith, Blake |
4/19/2022 |
Septic Release Inspection |
|
Health Dept |
4/19/2022 |
Failed: Building - Final |
Blower Door Came Back Under 3, No Automatic Damper Installed And Could Not Verify Fresh Air Intake Location Outside. |
Anthony Aslan |
5/24/2022 |
Passed: Building - Final |
Corrections Made |
Anthony Aslan |
5/27/2022 |