Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 409 SW BUFFALO CT
FORT WHITE, FL 32038
Parcel #: 03935-023
Acres: 6.40
Owner: Roach Sue
Subdivision: Arrow Head Acres
Zoning: A-3
Flood Zone: X
District: 4
Application #: 49443
Permit #: 000042252
Related Permit:
Submitted: Thursday, May 27, 2021
Issued: Thursday, July 1, 2021
Expires: Thursday, May 5, 2022
Completed: Thursday, May 5, 2022
Status: Completed
Septic Release? Yes
Notes:

Job Details
Elevation regulation Minimum Requirement
Finished floor requirement One foot above the road
Fema map number 12023C0485C
In floodway N
This is the construction of a Single Family Dwelling
Setbacks Front 30
Setback Side 1 25
Setback Side 2 25
Setbacks Rear 25
Stories 1
Heated Area (Sqft) 1073
Total Area (Sqft) 1073
Building Height 13
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title single family
Building Code Edition 2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000) 21-0501
If Other, explain the use of the structure. Existing mobile home will be removed within 30 days of new home completion
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition) two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Review Notes
5/27/2021 Application pending.
5/27/2021 Point Review - On Hold-Incomplete
6/9/2021 Point Review - Printed-Online Application
6/9/2021 Zoning Review - Reviewed
6/23/2021 Plan Review - Building Approved
6/23/2021 Plan Review - Electrical Approved
6/23/2021 Plan Review - Plumbing Approved
6/23/2021 Plan Review - Mechanical Approved
6/23/2021 Plan Review - Reviewed
7/1/2021 Zoning Review - Reviewed
7/1/2021 Final Review - Reviewed
7/1/2021 Final Review - Payment Needed
7/1/2021 Permit Issued
Contractors
Name/ Business License Title Role
Rodney D Wade
Wade Custom Homes Inc
County License & State License & Employees Workers Comp Expired.
CRC1331070 Cert. Residential Contractor
James Butler Jr
Butler Plumbing Of Gainesville Inc
CFC057960 Plumbing Contractor Subcontractor
Paula E Kennedy
Gainesville Roofing & Co Inc
CCC1328678 Cert. Roofing Subcontractor
Jack E Spann Jr
Creative Designs Electric Lllp
County License & State License Expired.
ER0004625 Reg. Electrical Subcontractor
Jonathan E Spann
Spann's Heating & Air Conditioning Inc
County License & State License & Liability Insurance & Workers Comp Expired.
CAC1815959 Cert. A/c Class “b” Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Setbacks Anthony Aslan 7/14/2021
Passed: Building - Footer Anthony Aslan 7/14/2021
Passed: Plumbing/Gas - 1st Underground Rough–In Laundry Trap In Slab Anthony Aslan 8/19/2021
Passed: Building - Slab Need Concrete Tickets Showing Fiber Mesh. Anthony Aslan 8/25/2021
Passed: Building - Roof Decking Matt Forsyth 9/29/2021
Passed: Building - Wall Sheathing Matt Forsyth 9/29/2021
Failed: Building - Framing Need J-bolts Other Each Side Of Girder Truss Stud Pack. Anthony Aslan 12/6/2021
Failed: Electrical - 2nd Rough-In Need Cts218 Strap On Top Plate Service Wire, More Than 50% Of Top Plate Cut Anthony Aslan 12/6/2021
Passed: Mechanical - Rough In Anthony Aslan 12/6/2021
Failed: Plumbing/Gas - Tub Set/Shower Pan Need Cts218 Strap Master Bath Vent Stack, More Than 50% Of Top Plate Cut Anthony Aslan 12/6/2021
Failed: Electrical - 2nd Rough-In Gate Locked Troy Crews 12/13/2021
Failed: Plumbing/Gas - 2nd Rough-In Gate Locked Troy Crews 12/13/2021
Cancelled: Mechanical - Rough In Anthony Aslan 12/15/2021
Passed: Electrical - 1st Underground Rough–In Correction Made Anthony Aslan 12/15/2021
Passed: Plumbing/Gas - 2nd Rough-In Correction Made Anthony Aslan 12/15/2021
Passed: Plumbing/Gas - Tub Set/Shower Pan Anthony Aslan 12/15/2021
Passed: Building - Framing Corrections Made Anthony Aslan 12/15/2021
Failed: Building - Insulation Not Completed, Insulator Still Working Anthony Aslan 12/21/2021
Passed: Building - Insulation Fill In Trench Anthony Aslan 12/22/2021
Passed: Electrical - Permanent Power Need Septic Release Anthony Aslan 2/21/2022
Release to power company Melissa Garber 3/10/2022
Septic Release Inspection Health Dept 3/10/2022
Failed: Building - Final No Bower Door Test, Outlet In Master Bath Not Properly Safety Off, A/c Condenser Must Have 4" In. Exposed On Pad, Missing Return Grill, Door Gaskets Missing Anthony Aslan 4/29/2022
Passed: Building - Final Corrections Made Anthony Aslan 5/5/2022
Documents
File Name Date File Size