Permit Details

Permit Search

Permit

Mobile Home

398 SE GUARDIAN GLN
LAKE CITY, FL 32025

Permit #
000042246
Application #
49690
Status Completed
  1. Submitted Jun 23, 2021
  2. Issued Jun 30, 2021
  3. Expires Feb 1, 2022
  4. Completed Aug 5, 2021

Property

Parcel #
10308-001
Owner
Tiitf/dept Of Corrections (giovanna Thon)
Acres
30.77
Subdivision
Columbia Correctional Institution Grounds
Zoning
A-1
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0330C
In floodway
N
Mobile Home is a:
Single Wide
Year Built
2021
Width (Ft.In)
16
Length (Ft.In)
60
Driveway access to home:
Existing Drive
Installation Decal #
81113
Septic #
x-city
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Dev Permit #
F023-
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
No
Serial #
S-5562B
Wind Zone?
2
Residential or Commercial Use?
Residential

Status & Review History

  1. Application pending.
  2. Point Review - Printed-Online Application
  3. Point Review - Reviewed
  4. Plan Review - Reviewed
  5. Zoning Review - Reviewed
  6. Final Review - Documents Required
  7. Final Review - Payment Needed
  8. Permit Issued

Contractors

  • Rodney A Carmichael

    Set Right Mobile Homes Llc

    License
    IH1025656
    Title
    Mh Installer (ih)
    Role
    Contractor

    County License & State License Expired.

  • Glenn Whittington

    Whittington Electric Inc

    License
    EC13002957
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Ronald Bonds Sr

    Style Crest Inc

    License
    CAC1817658
    Title
    Class "b" A/c Contractor
    Role
    Subcontractor

    County License & State License Expired.

Inspections

  1. Aug 4, 2021

    Cancelled: Engineering - Setbacks

    Inspected by Melissa Garber

  2. Aug 4, 2021

    Cancelled: Mobile Home - Mobile Home Set-Up Final

    Inspected by Melissa Garber

  3. Aug 5, 2021

    Passed: Mobile Home - Mobile Home Set-Up Final

    Need Green Sticker

    Inspected by Anthony Aslan

  4. Aug 5, 2021

    Release to power company

    Inspected by Anthony Aslan

  5. Aug 5, 2021

    Passed: Engineering - Setbacks

    Inspected by Anthony Aslan