Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Roof Replacement or Repair Permit
Address 529 SW MEADOW TER
LAKE CITY, FL 32024
Parcel #: 03405-110
Acres: 1.17
Owner: Roemer Theresa & Amy
Subdivision: Southwood Meadows
Zoning: A-3
Flood Zone: X
District: 5
Application #: 49745
Permit #: 000042216
Related Permit:
Submitted:
Issued: Thursday, June 24, 2021
Expires: Monday, August 23, 2021
Completed: Monday, August 23, 2021
Status: Completed
Septic Release? na
Notes:

Job Details
Type Roofing Job Replacement - Tear off Existing and Replace
Type of structure House
Commercial or Residential Residential
Roof Area (for this job) Sq Ft 2000
No. of Stories 1
Ventilation: Ridge Vent
Flashing: Use Existing
Drip Edge: Replace All
Valley Treatment: New Metal
Roof Pitch 4:12 or Greater
Is the existing roof being removed? No
Type of New Roofing Product Metal
Florida Product Approval Number fl17992
Product Manufacturer capital metal
Product Description 26 ga rib metal
Sealed roof decking options: (Must select an option.) Other (explain)
Sealed roof decking explanation for other option. metal roofover
Building Code Edition 2020 Florida Building Code 7th Edition and Florida Statute 553.844
Fema map number 12023C0383D
Review Notes
6/24/2021 Point Review - Status Cleared
6/24/2021 Permit Issued Permit #000042216 created and approved.
Contractors

This is an owner builder project.

Name/ Business License Title Role
Inspections
Inspection Notes Performed By Date
Passed: Re-Roof - Final Matt Forsyth 8/23/2021