Inspection |
Notes |
Performed By |
Date |
Failed: Electrical - Temporary Service |
Need Cover To Panel Breakers Exposed To Weather. |
Anthony Aslan |
7/15/2021 |
Passed: Electrical - Temporary Service |
|
Anthony Aslan |
7/20/2021 |
Release to power company |
|
Anthony Aslan |
7/20/2021 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Anthony Aslan |
7/28/2021 |
Failed: Building - Monolithic Slab |
Footers Washed In |
Anthony Aslan |
8/5/2021 |
Passed: Engineering - Setbacks |
|
Anthony Aslan |
8/5/2021 |
Passed: Engineering - Setbacks |
|
Anthony Aslan |
8/6/2021 |
Passed: Building - Monolithic Slab |
Re-dug Footers |
Anthony Aslan |
8/6/2021 |
Passed: Building - Roof Decking |
|
Anthony Aslan |
10/8/2021 |
Passed: Building - Strapping |
|
Anthony Aslan |
10/8/2021 |
Passed: Building - Wall Sheathing |
|
Anthony Aslan |
10/8/2021 |
Failed: Plumbing/Gas - 2nd Rough-In |
Missing Shower Valve In Hall Bath |
Anthony Aslan |
10/11/2021 |
Cancelled: Electrical - 2nd Rough-In |
|
Matt Forsyth |
10/21/2021 |
Cancelled: Mechanical - Rough In |
|
Matt Forsyth |
10/21/2021 |
Cancelled: Plumbing/Gas - 2nd Rough-In |
|
Matt Forsyth |
10/21/2021 |
Failed: Building - Framing |
Need Sp1 32"oc Ext. Wall |
Matt Forsyth |
10/21/2021 |
Passed: Electrical - 2nd Rough-In |
|
Matt Forsyth |
10/21/2021 |
Failed: Mechanical - Rough In |
Need Gaskets On Hvac Boots |
Matt Forsyth |
10/21/2021 |
Failed: Plumbing/Gas - 2nd Rough-In |
Master Bath Tub Needs Second Rough |
Matt Forsyth |
10/21/2021 |
Passed: Building - Framing |
|
Anthony Aslan |
10/25/2021 |
Passed: Plumbing/Gas - Tub Set/Shower Pan |
|
Anthony Aslan |
10/25/2021 |
Failed: Mechanical - Rough In |
Need Screws In Kitchen Exhaust Piping In Joints, Need Strapping On Bath Fan Exhaust Piping. |
Anthony Aslan |
10/25/2021 |
Failed: Building - Insulation |
Until Mechanical Passes |
Anthony Aslan |
10/25/2021 |
Passed: Mechanical - Rough In |
Rec'd Pictures
|
Anthony Aslan |
10/26/2021 |
Septic Release Inspection |
|
Health Dept |
12/7/2021 |
Passed: Electrical - Permanent Power |
|
Matt Forsyth |
12/8/2021 |
Release to power company |
|
Matt Forsyth |
12/8/2021 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Anthony Aslan |
1/6/2022 |
Failed: Building - Final |
Sinks In Bathrooms Not Installed,
tub In Master Not Installed,
need Blower Door,
return At Back Of Return And Filter Housing Not Taped, A/c Condenser Missing Service Valve Cap
need Final Termite Spray
no Water On House |
Anthony Aslan |
1/6/2022 |
Passed: Building - Final |
Correction Made |
Anthony Aslan |
1/10/2022 |