Inspection |
Notes |
Performed By |
Date |
Cancelled: Building - Footer |
|
Anthony Aslan |
8/6/2021 |
Cancelled: Building - Footer |
|
Anthony Aslan |
8/6/2021 |
Cancelled: Engineering - Setbacks |
|
Anthony Aslan |
8/6/2021 |
Passed: Building - Footer |
|
Anthony Aslan |
8/6/2021 |
Passed: Engineering - Setbacks |
|
Anthony Aslan |
8/6/2021 |
Passed: Building - Rated Assembly Fastening |
Partial Framing |
Anthony Aslan |
8/31/2021 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
9/13/2021 |
Passed: Building - Roof Decking |
Need Another Layer Of Paper |
Anthony Aslan |
9/17/2021 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
Gas Lines Under Pressure |
Anthony Aslan |
10/25/2021 |
Passed: Building - Slab |
|
Anthony Aslan |
11/4/2021 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Anthony Aslan |
12/10/2021 |
Passed: Plumbing/Gas - Tub Set/Shower Pan |
|
Anthony Aslan |
12/10/2021 |
Septic Release Inspection |
|
Health Dept |
4/1/2022 |
Failed: Building - Wall Sheathing |
No Caulking Behind Flange Of Windows |
Anthony Aslan |
5/17/2022 |
Passed: Building - Wall Sheathing |
Windows Caulked |
Anthony Aslan |
5/19/2022 |
Passed: Plumbing/Gas - 2nd Rough-In |
Missing Nail Guard Vent Pipe Hall |
Anthony Aslan |
8/29/2022 |
Failed: Mechanical - Rough In |
No Gaskets On Boots, Duck Not Strapped, Supply Duck That Is Crossing Dryer Vent Needs To Have Insulation Between Dryer Vent And Supply Duct. Return Vent Not Connected |
Anthony Aslan |
8/29/2022 |
Passed: Building - Framing |
|
Anthony Aslan |
9/27/2022 |
Passed: Electrical - 2nd Rough-In |
|
Anthony Aslan |
9/27/2022 |
Passed: Mechanical - Rough In |
Gaskets Fell Off Some Of Boots |
Anthony Aslan |
9/27/2022 |
Passed: Building - Insulation |
Spray Foam |
Anthony Aslan |
10/10/2022 |
Passed: Electrical - Permanent Power |
|
Anthony Aslan |
7/12/2023 |
Release to power company |
|
Anthony Aslan |
7/12/2023 |
Passed: Building - Final |
|
Anthony Aslan |
7/24/2023 |