Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
Mccormick, David |
6/17/2021 |
Passed: Building - Footer |
|
Troy Crews |
6/17/2021 |
Passed: Engineering - Setbacks |
|
Troy Crews |
6/17/2021 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
7/28/2021 |
Passed: Building - Slab |
|
Troy Crews |
8/4/2021 |
Passed: Electrical - Temporary Service |
|
Anthony Aslan |
9/1/2021 |
Release to power company |
|
Anthony Aslan |
9/1/2021 |
Passed: Building - Roof Decking |
|
Troy Crews |
10/1/2021 |
Passed: Building - Wall Sheathing |
|
Troy Crews |
10/1/2021 |
Septic Release Inspection |
|
Health Dept |
10/28/2021 |
Passed: Building - Framing |
|
Troy Crews |
12/3/2021 |
Passed: Electrical - 2nd Rough-In |
|
Troy Crews |
12/3/2021 |
Failed: Mechanical - Rough In |
Platform For Air Handler Not Large Enough |
Troy Crews |
12/3/2021 |
Failed: Plumbing/Gas - 2nd Rough-In |
Need To Cap Unused Drain Line At Shower 2 Lines Are There Need To Cap Unused Line. |
Troy Crews |
12/3/2021 |
Passed: Plumbing/Gas - 2nd Rough-In |
Seal Unused Chase Pipe In Shower Wall |
Troy Crews |
12/16/2021 |
Passed: Mechanical - Rough In |
Platform Enlarged |
Troy Crews |
12/16/2021 |
Passed: Building - Insulation |
|
Troy Crews |
12/16/2021 |
Failed: Engineering - Final Driveway |
Need Ditch Restored Back With Sod And Road Swept Clean. |
Smith, Blake |
3/17/2022 |
Passed: Electrical - Permanent Power |
Need Driveway Final , Temp Drive Needs Removed Ditch Cleaned; Final Co Not To Be Given Until Ditch Is Restored Back With Sod. |
Troy Crews |
3/21/2022 |
Passed: Engineering - Final Driveway |
Final Co Not To Be Given Until Ditch Is Restored Back With Sod. |
Smith, Blake |
3/22/2022 |
Release to power company |
Conditional Release |
Troy Crews |
3/23/2022 |
Passed: Building - Final |
|
Troy Crews |
4/1/2022 |