Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
Mccormick, David |
6/16/2021 |
Passed: Building - Footer |
|
Matt Forsyth |
6/22/2021 |
Passed: Engineering - Setbacks |
|
Matt Forsyth |
6/22/2021 |
Passed: Electrical - Temporary Service |
|
Matt Forsyth |
6/28/2021 |
Release to power company |
|
Matt Forsyth |
6/28/2021 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Matt Forsyth |
7/23/2021 |
Passed: Building - Monolithic Slab |
|
Matt Forsyth |
8/20/2021 |
Passed: Engineering - Setbacks |
|
Matt Forsyth |
8/20/2021 |
Passed: Building - Slab |
|
Matt Forsyth |
8/20/2021 |
Passed: Building - Ext Strapping/Wall Sheathing |
|
Matt Forsyth |
9/23/2021 |
Passed: Building - Framing |
Need Updated Truss Engineering |
Matt Forsyth |
9/23/2021 |
Passed: Building - Roof Decking |
|
Matt Forsyth |
9/23/2021 |
Failed: Electrical - 2nd Rough-In |
Need Smoke Detector Moved Further Away From Hv Ac Boot In Master Bed |
Matt Forsyth |
10/15/2021 |
Passed: Mechanical - Rough In |
|
Matt Forsyth |
10/15/2021 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Matt Forsyth |
10/15/2021 |
Passed: Building - Insulation |
Double Wall In Living Room Needs To Have A Draft Stop Before Sheet Rock |
Matt Forsyth |
10/20/2021 |
Passed: Electrical - Permanent Power |
Need Septic Release To Release Power |
Matt Forsyth |
12/15/2021 |
Passed: Engineering - Final Driveway |
|
Smith, Blake |
12/20/2021 |
Release to power company |
|
Melissa Garber |
1/4/2022 |
Septic Release Inspection |
|
Health Dept |
1/4/2022 |
Failed: Building - Final |
Water Heaters On Finished Floor Level Need To Be Piped To The Outside( Overflow) Electrical Outlet On Back Porch Next To Slider Door Handle Will Not Ground Out |
Matt Forsyth |
2/8/2022 |
Passed: Building - Final |
Items Addressed |
Matt Forsyth |
2/10/2022 |