Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 563 SW PINEHURST DR
LAKE CITY, FL 32024
Parcel #: 03087-116
Acres: 0.67
Owner: Alex & Blondina Stevens Family Llc
Subdivision: Forest Country Sixth Addition
Zoning: RSF-2
Flood Zone: X
District: 3
Application #: 49308
Permit #: 000042058
Related Permit: Culvert: 000042059
Submitted: Friday, November 19, 2021
Issued: Thursday, July 1, 2021
Expires: Wednesday, September 21, 2022
Completed: Wednesday, September 21, 2022
Status: Completed
Septic Release? Yes
Notes:
ELEVATION CONFIRMATION REC'D @ 109.76
Job Details
This is the construction of a Single Family Dwelling
Heated Area (Sqft) 2277
Total Area (Sqft) 3356
Stories 1
Building Height 20
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title single family
Setbacks Front 25'
Setback Side 1 10'
Setback Side 2 10'
Setbacks Rear 15'
Septic# (00-0000) or (X00-000) 21-0447
Building Code Edition 2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Elevation regulation Engineers Elevation Letter
Finished floor requirement 109.00'
Requirement needed By Nailing Inspection
Document needed is a Surveyor letter giving the Finished Floor Elevation
Document receieved Yes
Fema map number 12023C0289D
In floodway N
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition) two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Review Notes
5/13/2021 Point Review - Received-Hard Copy Application
5/17/2021 Zoning Review - Reviewed NEEDED: EH CERTIFICATE OF LIABILITY - JASON ELIXSON CONSTRUCTION, LLC. ROOF OPTION
6/1/2021 Zoning Review - Reviewed NEEDED: CERTIFICATE OF LIABILITY - JASON ELIXSON CONSTRUCTION, LLC. BURNS EMPLOYEES WORKER COMP
6/2/2021 Plan Review - Reviewed NEEDED: CERTIFICATE OF LIABILITY - JASON ELIXSON CONSTRUCTION, LLC. BURNS EMPLOYEES WORKER COMP
6/2/2021 Final Review - Documents Required NEEDED: CERTIFICATE OF LIABILITY - JASON ELIXSON CONSTRUCTION, LLC.
6/2/2021 Final Review - Payment Needed
6/2/2021 Permit Issued Permit #000042058 created and approved.
7/1/2021 Permit reissued to reflect updated information.
9/19/2022 Final Review - Payment Needed
Contractors
Name/ Business License Title Role
Clifford J Elixson
Jason Elixson Construction,llc.
County License & State License & Liability Insurance & Workers Comp Expired.
CBC1250331 Building Contractor Contractor
Matthew H Burns
Burns Electrical Services Inc
EC13006531 Electrical Contractor Subcontractor
Roger Whiddon
Whiddon Construction Co. Inc
Liability Insurance & Employees Workers Comp Expired.
CRC1328025 Residential Contractor Subcontractor
Clinton G Wilson
Wilson Heat & Air Inc
CAC057886 Class B A/c Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Initial Driveway Mccormick, David 6/2/2021
Passed: Electrical - Temporary Service Troy Crews 6/4/2021
Release to power company Troy Crews 6/4/2021
Passed: Building - Footer Matt Forsyth 6/22/2021
Passed: Engineering - Setbacks Matt Forsyth 6/22/2021
Passed: Plumbing/Gas - 1st Underground Rough–In Matt Forsyth 8/17/2021
Failed: Building - Slab Any #4 Bar Needs To Be Removed And Replaced With #5 Bar Matt Forsyth 8/25/2021
Passed: Building - Slab Matt Forsyth 8/25/2021
Passed: Building - Ext Strapping/Wall Sheathing Troy Crews 11/19/2021
Passed: Building - Framing Matt Forsyth 3/9/2022
Passed: Electrical - 2nd Rough-In Matt Forsyth 3/9/2022
Passed: Mechanical - Rough In Matt Forsyth 3/9/2022
Passed: Plumbing/Gas - 2nd Rough-In Matt Forsyth 3/9/2022
Passed: Building - Insulation Walls Only Matt Forsyth 3/16/2022
Septic Release Inspection Health Dept 6/21/2022
Passed: Electrical - Permanent Power Need Driveway Released Matt Forsyth 6/28/2022
Failed: Engineering - Final Driveway Drive Way Not Complete Smith, Blake 7/7/2022
Release to power company Melissa Garber 7/26/2022
Passed: Engineering - Final Driveway Smith, Blake 7/26/2022
Failed: Electrical - Permanent Power Need To Pay Assessment Fees In Order To Request Final Troy Crews 9/21/2022
Passed: Building - Final Matt Forsyth 9/21/2022
Documents
File Name Date File Size
Win_20220921_11_23_57_pro 2022-09-21 11.32.17.250.jpg 2023.12.24 124.13kB
Owner And Contractor Signature Page 20210610 050547.pdf 2023.12.24 455.01kB
Property Appraiser Parcel Details Printed Page 20210610 051146.pdf 2023.12.24 763.71kB
Recorded Notice Of Commencement 20210610 050646.pdf 2023.12.24 293.40kB
Recorded Deed.pdf 2023.12.24 878.60kB
Manual J Forms 20210610 051447.pdf 2023.12.24 1,016.80kB
Power Release-release To Power Company 20220726.pdf 2023.12.24 39.06kB
Structural Engineering And Wind Load Calculations 20210610 051348.pdf 2023.12.24 2.24MB
Truss Engineering 20210610 051646.pdf 2023.12.24 21.88MB
Lidar 49308 2021-05-17 16.34.40.863.pdf 2023.12.24 114.31kB
Truss Engineering 20210610 051446.pdf 2023.12.24 511.02kB
Stevens Eh 2021-05-19 16.41.56.650.pdf 2023.12.24 625.93kB
Elevation Letter 563 Sw Pinehurst Drive Lake City Fl 07-01-21 2021-07-01 17.09.08.460.pdf 2023.12.24 916.99kB
Original Permit 20210602.pdf 2023.12.24 43.20kB
42058 Plans.pdf 2023.12.24 4.13MB
Win_20220921_11_23_25_pro 2022-09-21 11.30.34.902.jpg 2023.12.24 240.69kB
Site Plan 20210610 050646.pdf 2023.12.24 186.85kB
Certificate Of Occupancy 20220921.pdf 2023.12.24 68.99kB
Energy Code Forms 20210610 051347.pdf 2023.12.24 2.65MB
Subcontractor Form 20210610 050647.pdf 2023.12.24 852.68kB
New Well Letter 20210610 052146.pdf 2023.12.24 190.14kB
Power Release-electrical-temporary Service 20210604.pdf 2023.12.24 38.91kB
Surveyor Letter Giving The Finished Floor Elevation 2021-11-19 16.46.54.166.pdf 2023.12.24 1.08MB
Product Approval Code Specifications Form 20210610 051346.pdf 2023.12.24 286.39kB
Application Information Page 20210610 050546.pdf 2023.12.24 360.84kB
Pinehurst Product Approval 2021-05-18 14.16.07.472.pdf 2023.12.24 392.41kB
Updated Permit 20210701.pdf 2023.12.24 43.21kB
911 Address Form 20210610 051047.pdf 2023.12.24 272.42kB
Residential Or Commercial Checklist 20210610 051246.pdf 2023.12.24 1.86MB
Corporate Articles Listing The Owner Or Poa Form Or Executor Documents 20210610 051247.pdf 2023.12.24 226.32kB
Win_20210825_11_33_17_pro 2021-08-25 11.33.52.837.jpg 2023.12.24 227.35kB