Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 563 SW PINEHURST DR
LAKE CITY, FL 32024
Parcel #: 03087-116
Acres: 0.67
Owner: Alex & Blondina Stevens Family Llc
Subdivision: Forest Country Sixth Addition
Zoning: RSF-2
Flood Zone: X
District: 3
Application #: 49308
Permit #: 000042058
Related Permit: Culvert: 000042059
Submitted: Friday, November 19, 2021
Issued: Thursday, July 1, 2021
Expires: Wednesday, September 21, 2022
Completed: Wednesday, September 21, 2022
Status: Completed
Septic Release? Yes
Notes:
ELEVATION CONFIRMATION REC'D @ 109.76
Job Details
Finished floor requirement
Fema map number 12023C0291D
Type Roofing Job Replacement - Tear off Existing and Replace
Type of structure Commercial Building
Commercial or Residential Commercial
Roof Area (for this job) Sq Ft 1200
No. of Stories 1
Roof Pitch 2:12 to 4:12
Is the existing roof being removed? Yes
Type of New Roofing Product Asphalt Shingles
Florida Product Approval Number 10124.1 GAF
Product Manufacturer gaf
Product Description shingles
Building Code Edition 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options: (Must select an option.) two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Ventilation: Ridge Vent
Flashing: Replace All
Drip Edge: Replace All
Valley Treatment: New Mineral Surface
Review Notes
5/13/2021 Point Review - Received-Hard Copy Application
5/17/2021 Zoning Review - Reviewed
6/1/2021 Zoning Review - Reviewed
6/2/2021 Plan Review - Reviewed
6/2/2021 Final Review - Documents Required
6/2/2021 Final Review - Payment Needed
6/2/2021 Permit Issued
7/1/2021 Permit reissued to reflect updated information.
9/19/2022 Final Review - Payment Needed
Contractors
Name/ Business License Title Role
Clifford J Elixson
Jason Elixson Construction,llc.
County License & State License & Liability Insurance & Workers Comp Expired.
CBC1250331 Building Contractor Contractor
Matthew H Burns
Burns Electrical Services Inc
EC13006531 Electrical Contractor Subcontractor
Roger Whiddon
Whiddon Construction Co. Inc
CRC1328025 Residential Contractor Subcontractor
Clinton G Wilson
Wilson Heat & Air Inc
CAC057886 Class B A/c Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Initial Driveway Mccormick, David 6/2/2021
Passed: Electrical - Temporary Service Troy Crews 6/4/2021
Release to power company Troy Crews 6/4/2021
Passed: Building - Footer Matt Forsyth 6/22/2021
Passed: Engineering - Setbacks Matt Forsyth 6/22/2021
Passed: Plumbing/Gas - 1st Underground Rough–In Matt Forsyth 8/17/2021
Failed: Building - Slab Any #4 Bar Needs To Be Removed And Replaced With #5 Bar Matt Forsyth 8/25/2021
Passed: Building - Slab Matt Forsyth 8/25/2021
Passed: Building - Ext Strapping/Wall Sheathing Troy Crews 11/19/2021
Passed: Building - Framing Matt Forsyth 3/9/2022
Passed: Electrical - 2nd Rough-In Matt Forsyth 3/9/2022
Passed: Mechanical - Rough In Matt Forsyth 3/9/2022
Passed: Plumbing/Gas - 2nd Rough-In Matt Forsyth 3/9/2022
Passed: Building - Insulation Walls Only Matt Forsyth 3/16/2022
Septic Release Inspection Health Dept 6/21/2022
Passed: Electrical - Permanent Power Need Driveway Released Matt Forsyth 6/28/2022
Failed: Engineering - Final Driveway Drive Way Not Complete Smith, Blake 7/7/2022
Release to power company Melissa Garber 7/26/2022
Passed: Engineering - Final Driveway Smith, Blake 7/26/2022
Failed: Electrical - Permanent Power Need To Pay Assessment Fees In Order To Request Final Troy Crews 9/21/2022
Passed: Building - Final Matt Forsyth 9/21/2022
Documents
File Name Date File Size