Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 242 SW TIMBERLAND CT
LAKE CITY, FL 32024
Parcel #: 02438-192
Acres: 0.50
Owner: Cornerstone Developers Ii Llc
Subdivision: Emerald Cove Phase 2
Zoning: RSF-2
Flood Zone: X
District: 3
Application #: 49112
Permit #: 000042027
Related Permit: Culvert: 000042028
Submitted: Monday, October 18, 2021
Issued: Thursday, May 27, 2021
Expires: Tuesday, January 4, 2022
Completed: Tuesday, January 4, 2022
Status: Completed
Septic Release? Yes
Notes:
ENGINEER LETTER PROVIDED BEFORE PERMITTED ELEVATION CONFIRMATION LETTER REC'D @ 111.26
Job Details
Elevation regulation Engineers Elevation Letter
Finished floor requirement 110'
Requirement needed By Nailing Inspection
Document needed is a Surveyor letter giving the Finished Floor Elevation
Document receieved Yes
Fema map number 12023C0290D
In floodway N
This is the construction of a Single Family Dwelling
Setbacks Front 25'
Setback Side 1 10'
Setback Side 2 10'
Setbacks Rear 15'
Stories 1
Heated Area (Sqft) 1730
Total Area (Sqft) 2464
Building Height 20
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title single family dwelling
Building Code Edition 2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000) 21-0454
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition) two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Review Notes
4/22/2021 Point Review - Received-Hard Copy Application
4/22/2021 Point Review - Reviewed
5/5/2021 Plan Review - Reviewed
5/14/2021 Zoning Review - Reviewed
5/14/2021 Final Review - Documents Required
5/14/2021 Final Review - Documents Required
5/27/2021 Permit Issued
10/4/2021 Final Review - Payment Needed
10/18/2021 Final Review - Payment Needed
Contractors
Name/ Business License Title Role
Jerry Castagna
Castagna Construction Inc
County License & State License & Liability Insurance & Workers Comp Expired.
CBC047842 Building Contractor Contractor
Marcus Matthews
Matthews Electric Llc
EC13005459 Electrical Contractor Subcontractor
Frank Soucinek
Dependable Plumbing
County License & State License & Workers Comp & Employees Workers Comp Expired.
CFC057747 Plumbing Contractor Subcontractor
Darin L Summerlin
Summerlin Roofing Inc
CCC1326192 Roofing Contractor Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Initial Driveway Mccormick, David 5/28/2021
Passed: Plumbing/Gas - 1st Underground Rough–In Troy Crews 6/4/2021
Failed: Building - Monolithic Slab Minimum Curb Dimension 6 Inches Four Monolithic Slab Also Ventt Stack Needs Definite Clearance Off Of Form Board Matt Forsyth 6/11/2021
Passed: Engineering - Setbacks Matt Forsyth 6/11/2021
Passed: Building - Monolithic Slab Matt Forsyth 6/14/2021
Passed: Engineering - Setbacks Matt Forsyth 6/14/2021
Passed: Building - Roof Decking Matt Forsyth 7/13/2021
Passed: Building - Wall Sheathing Matt Forsyth 7/13/2021
Passed: Building - Framing Troy Crews 7/30/2021
Passed: Building - Strapping Troy Crews 7/30/2021
Passed: Electrical - 2nd Rough-In Troy Crews 7/30/2021
Passed: Mechanical - Rough In Troy Crews 7/30/2021
Passed: Plumbing/Gas - 2nd Rough-In Troy Crews 7/30/2021
Passed: Plumbing/Gas - Tub Set/Shower Pan Troy Crews 7/30/2021
Passed: Building - Insulation Troy Crews 8/4/2021
Passed: Engineering - Final Driveway Mccormick, David 10/4/2021
Passed: Electrical - Permanent Power Need Septic Release To Release Power Matt Forsyth 10/5/2021
Release to power company Melissa Garber 10/18/2021
Septic Release Inspection Health Dept 10/18/2021
Passed: Building - Final Matt Forsyth 1/4/2022