Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 589 NW BRIDGEWATER TER
LAKE CITY, FL 32055
Parcel #: 02275-113
Acres: 2.06
Owner: Scheffler Dean A & Melodee
Subdivision: Cobblestone Unit 1
Zoning: RR
Flood Zone: X
District: 1
Application #: 49120
Permit #: 000042004
Related Permit: Culvert: 000042005
Submitted: Friday, April 23, 2021
Issued: Wednesday, May 26, 2021
Expires: Wednesday, June 29, 2022
Completed: Wednesday, June 29, 2022
Status: Completed
Septic Release? Yes
Notes:
STORAGE BUILDING APPLICATION #49288 SUBMITTED AT SAME TIME AS HOME ELEVATION CONFIRMATION REC'D @ 163.20'
Job Details
Elevation regulation Subdivision Plat
Finished floor requirement 163'
Requirement needed By Nailing Inspection
Document needed is a Surveyor letter giving the Finished Floor Elevation
Document receieved Yes
Fema map number 12023C0283D
In floodway N
This is the construction of a Single Family Dwelling
Setbacks Front 25'
Setback Side 1 10'
Setback Side 2 10'
Setbacks Rear 15'
Stories 1
Heated Area (Sqft) 2168
Total Area (Sqft) 3331
Building Height 19
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title single family dwelling
Building Code Edition 2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000) 21-0439
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition) two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Review Notes
4/23/2021 Application pending.
4/26/2021 Point Review - On Hold-Incomplete
5/11/2021 Point Review - Printed-Online Application
5/12/2021 Zoning Review - Reviewed
5/13/2021 Zoning Review - Reviewed
5/21/2021 Plan Review - Reviewed
5/25/2021 Zoning Review - Reviewed
5/25/2021 Final Review - Reviewed
5/25/2021 Final Review - Payment Needed
5/26/2021 Permit Issued
5/31/2022 Final Review - Payment Needed
Contractors
Name/ Business License Title Role
Isaiah Cully
Ic Construction Llc
CBC1259655 Building Contractor Contractor
Cody Barrs
Barrs Plumbing Inc
CFC1427145 Plumbing Contractor Subcontractor
Tyler M Turner
Tmt Roofing Llc
CCC1330410 Cert Roofing Subcontractor
Everton D Ruddock
D&s Lighting Inc
EC13003800 Electrical Contractor Subcontractor
Clinton G Wilson
Wilson Heat & Air Inc
CAC057886 Class B A/c Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Electrical - Temporary Service Anthony Aslan 7/14/2021
Release to power company Anthony Aslan 7/14/2021
Passed: Building - Footer Install Grade Stakes Prior To Pour Troy Crews 9/13/2021
Passed: Engineering - Setbacks Troy Crews 9/13/2021
Failed: Plumbing/Gas - 1st Underground Rough–In Not Ready Anthony Aslan 10/15/2021
Passed: Plumbing/Gas - 1st Underground Rough–In Anthony Aslan 10/18/2021
Passed: Building - Slab Anthony Aslan 10/20/2021
Passed: Building - Roof Decking Anthony Aslan 12/15/2021
Passed: Building - Wall Sheathing Anthony Aslan 12/15/2021
Failed: Building - Framing -anchors Missing At Bottom Plate Splices, Garage And House -need Engineer Clarification On Garage Bottom Plate Drawings Show Double Plate, Also Need Clarification On Truss To Header Strapping. need Clarification On Gable Detail Shows Lsta30 Strap On Lateral Bracing, Installed Is Flat Strapping Gable. -girder Truss Missing Htt5-kt, And Stud Packs -truss T03 Strapping Does Not Meet Uplift -t14, 15, 16 Missing Lateral Engineering Anthony Aslan 1/3/2022
Cancelled: Building - Framing Anthony Aslan 1/24/2022
Passed: Building - Framing Correction Made Anthony Aslan 2/11/2022
Failed: Building - Insulation Need To Schedule Mech, Plumbing, Electrical Rough Anthony Aslan 2/22/2022
Failed: Plumbing/Gas - 2nd Rough-In Refrigerator Supply Line Not Connected Anthony Aslan 2/23/2022
Failed: Mechanical - Rough In Ever Supply And Return Needs To Be Pulled Back Sealed On Inter Liner, Needs To Be Inspected Before Out Liner Is Sealed table C403.2.9.2duct System Construction And Sealing Anthony Aslan 2/23/2022
Passed: Electrical - 2nd Rough-In Anthony Aslan 2/23/2022
Failed: Building - Insulation All Trades Need To Be Corrected Before Insulation Is Passed Anthony Aslan 2/23/2022
Passed: Mechanical - Rough In Anthony Aslan 2/28/2022
Passed: Plumbing/Gas - 2nd Rough-In Anthony Aslan 2/28/2022
Passed: Engineering - Initial Driveway Smith, Blake 4/18/2022
Passed: Engineering - Final Driveway Smith, Blake 4/18/2022
Septic Release Inspection Health Dept 4/27/2022
Passed: Electrical - Permanent Power Anthony Aslan 6/1/2022
Release to power company Anthony Aslan 6/1/2022
Passed: Building - Final Need Blower Door, Back Door Hits Wall Water Heater, Need All Exhaust Openings In Soffit Grills Installed, Kitchen Exhaust Pipe - M1503.1general. range Hoods Shall Discharge To The Outdoors Through A Duct. The Duct Serving The Hood Shall Have A Smooth Interior Surface, Shall Be Air Tight, Shall Be Equipped With A Back-draft Damper And Shall Be Independent Of All Other Exhaust Systems. Ducts Serving Range Hoods Shall Not Terminate In An Attic Or Crawl Space Or Areas Inside The Building. Anthony Aslan 6/23/2022