Inspection |
Notes |
Performed By |
Date |
Passed: Electrical - Temporary Service |
|
Anthony Aslan |
7/14/2021 |
Release to power company |
|
Anthony Aslan |
7/14/2021 |
Passed: Building - Footer |
Install Grade Stakes Prior To Pour |
Troy Crews |
9/13/2021 |
Passed: Engineering - Setbacks |
|
Troy Crews |
9/13/2021 |
Failed: Plumbing/Gas - 1st Underground Rough–In |
Not Ready |
Anthony Aslan |
10/15/2021 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Anthony Aslan |
10/18/2021 |
Passed: Building - Slab |
|
Anthony Aslan |
10/20/2021 |
Passed: Building - Roof Decking |
|
Anthony Aslan |
12/15/2021 |
Passed: Building - Wall Sheathing |
|
Anthony Aslan |
12/15/2021 |
Failed: Building - Framing |
-anchors Missing At Bottom Plate Splices, Garage And House
-need Engineer Clarification On Garage Bottom Plate Drawings Show Double Plate, Also Need Clarification On Truss To Header Strapping.
need Clarification On Gable Detail Shows Lsta30 Strap On Lateral Bracing, Installed Is Flat Strapping Gable.
-girder Truss Missing Htt5-kt, And Stud Packs
-truss T03 Strapping Does Not Meet Uplift
-t14, 15, 16 Missing Lateral Engineering |
Anthony Aslan |
1/3/2022 |
Cancelled: Building - Framing |
|
Anthony Aslan |
1/24/2022 |
Passed: Building - Framing |
Correction Made |
Anthony Aslan |
2/11/2022 |
Failed: Building - Insulation |
Need To Schedule Mech, Plumbing, Electrical Rough |
Anthony Aslan |
2/22/2022 |
Failed: Plumbing/Gas - 2nd Rough-In |
Refrigerator Supply Line Not Connected |
Anthony Aslan |
2/23/2022 |
Failed: Mechanical - Rough In |
Ever Supply And Return Needs To Be Pulled Back Sealed On Inter Liner, Needs To Be Inspected Before Out Liner Is Sealed
table C403.2.9.2duct System Construction And Sealing |
Anthony Aslan |
2/23/2022 |
Passed: Electrical - 2nd Rough-In |
|
Anthony Aslan |
2/23/2022 |
Failed: Building - Insulation |
All Trades Need To Be Corrected Before Insulation Is Passed |
Anthony Aslan |
2/23/2022 |
Passed: Mechanical - Rough In |
|
Anthony Aslan |
2/28/2022 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Anthony Aslan |
2/28/2022 |
Passed: Engineering - Initial Driveway |
|
Smith, Blake |
4/18/2022 |
Passed: Engineering - Final Driveway |
|
Smith, Blake |
4/18/2022 |
Septic Release Inspection |
|
Health Dept |
4/27/2022 |
Passed: Electrical - Permanent Power |
|
Anthony Aslan |
6/1/2022 |
Release to power company |
|
Anthony Aslan |
6/1/2022 |
Passed: Building - Final |
Need Blower Door, Back Door Hits Wall Water Heater, Need All Exhaust Openings In Soffit Grills Installed, Kitchen Exhaust Pipe - M1503.1general.
range Hoods Shall Discharge To The Outdoors Through A Duct. The Duct Serving The Hood Shall Have A Smooth Interior Surface, Shall Be Air Tight, Shall Be Equipped With A Back-draft Damper And Shall Be Independent Of All Other Exhaust Systems. Ducts Serving Range Hoods Shall Not Terminate In An Attic Or Crawl Space Or Areas Inside The Building.
|
Anthony Aslan |
6/23/2022 |
Certificate-Release Certificate |
Rec'd Docs & Pictures |
Anthony Aslan |
6/29/2022 |