Mobile Home
Permit
| Application #: | 49127 |
| Permit #: |
000041985 |
| Related Permit: |
|
| Submitted: | Monday, April 26, 2021 |
| Issued: | Friday, May 21, 2021 |
| Expires: | Monday, July 19, 2021 |
| Completed: | Monday, July 19, 2021 |
| Status: |
Completed |
| Septic Release? |
Yes |
Job Details
| Elevation regulation |
Minimum Requirement |
| Finished floor requirement |
One foot above the road |
| Fema map number |
12023C0370C |
| In floodway |
N |
| Mobile Home is a: |
Double Wide |
| Year Built |
2021 |
| Width (Ft.In) |
32 |
| Length (Ft.In) |
76 |
| Driveway access to home: |
Culvert Waiver |
| Installation Decal # |
61902 |
| Septic # |
21-0424 |
| Setbacks Front |
30' |
| Setback Side 1 |
25' |
| Setbacks Rear |
25' |
| Dev Permit # |
F023- |
| Setback Side 2 |
25' |
| Are you applying for a 5 year temporary permit? |
No |
| Serial # |
LOHGA10022128AB |
| Wind Zone? |
2 |
| Residential or Commercial Use? |
Residential |
Review Notes
| 4/26/2021 |
Application pending. |
| 4/26/2021 |
Point Review - Printed-Online Application |
| 4/26/2021 |
Point Review - Reviewed |
| 4/28/2021 |
Plan Review - Reviewed |
| 4/28/2021 |
Zoning Review - Reviewed |
| 4/28/2021 |
Final Review - Documents Required |
| 5/6/2021 |
Final Review - Documents Required |
| 5/21/2021 |
Final Review - Payment Needed |
| 5/21/2021 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Robert D Sheppard Melvins Mobile Home Service
|
IH1025386 |
Mh Installer (ih) |
Contractor |
Glenn Whittington Whittington Electric Inc
|
EC13002957 |
Electrical Contractor |
Subcontractor |
Ronald Bonds Sr Style Crest Inc
|
CAC1817658 |
Class "b" A/c Contractor |
Subcontractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Failed: Mobile Home - Mobile Home Set-Up Final |
No Install Decal |
Matt Forsyth |
7/15/2021 |
| Passed: Engineering - Setbacks |
|
Matt Forsyth |
7/15/2021 |
| Passed: Mobile Home - Mobile Home Set-Up Final |
|
Matt Forsyth |
7/19/2021 |
| Release to power company |
|
Matt Forsyth |
7/19/2021 |
| Passed: Engineering - Setbacks |
|
Matt Forsyth |
7/19/2021 |
| Septic Release Inspection |
|
Health Dept |
7/22/2021 |