Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 215 SW CHERRY BLOSSOM WAY
LAKE CITY, FL 32024
Parcel #: 03011-122
Acres: 0.30
Owner: Stanley Crawford Construction
Subdivision: Rose Pointe
Zoning: PRD
Flood Zone: X
District: 3
Application #: 48619
Permit #: 000041982
Related Permit: Culvert Waiver: 000041983
Submitted: Thursday, March 11, 2021
Issued: Friday, May 21, 2021
Expires: Thursday, February 24, 2022
Completed: Thursday, February 24, 2022
Status: Completed
Septic Release? Yes
Notes:
ELEVATION CONFIRMATION REC'D @ 104.37'
Job Details
Elevation regulation Subdivision Plat
Finished floor requirement 104'
Requirement needed By Nailing Inspection
Document needed is a Surveyor letter giving the Finished Floor Elevation
Document receieved Yes
Fema map number 12023C0289D
This is the construction of a Single Family Dwelling
Setbacks Front 20'
Setback Side 1 10'
Setback Side 2 10'
Setbacks Rear 15'
Stories 1
Heated Area (Sqft) 1293
Total Area (Sqft) 1904
Building Height 18.5
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title single family
Building Code Edition 2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000) 21-0270
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition) a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Review Notes
3/3/2021 Application pending.
3/11/2021 Point Review - On Hold-Incomplete
4/20/2021 Point Review - Printed-Online Application
4/23/2021 Zoning Review - Corrections Needed
5/3/2021 Plan Review - Reviewed
5/13/2021 Zoning Review - Corrections Needed
5/14/2021 Zoning Review - Reviewed
5/14/2021 Final Review - Reviewed
5/14/2021 Final Review - Payment Needed
5/18/2021 Final Review - Payment Needed
5/21/2021 Final Review - Payment Needed
5/21/2021 Permit Issued
1/27/2022 Final Review - Payment Needed
Contractors
Name/ Business License Title Role
Kenneth Ault
Kenneth Edward Ault Plumbing Inc
County License & State License & Liability Insurance & Workers Comp & Employees Workers Comp Expired.
CFC1429807 Cert. Plumbing Subcontractor
Ralph W Laverdure
Rwl Roofing,llc.
CCC1328590 Roofing Contractor Subcontractor
Donald R Davis
High Springs Electric Inc
CAC1815367 Class B A/c Subcontractor
Donald R Davis
High Springs Electric Inc
CAC1815367 Class B A/c Subcontractor
William S Crawford
Stanley Crawford Construction Inc
County License & State License & Liability Insurance & Workers Comp & Employees Workers Comp Expired.
RG0042896 General Contractor Contractor
Inspections
Inspection Notes Performed By Date
Passed: Building - Footer Troy Crews 6/3/2021
Passed: Engineering - Setbacks Troy Crews 6/3/2021
Passed: Plumbing/Gas - 1st Underground Rough–In Matt Forsyth 6/28/2021
Passed: Building - Slab Matt Forsyth 7/8/2021
Passed: Electrical - Temporary Service Matt Forsyth 9/14/2021
Release to power company Matt Forsyth 9/14/2021
Passed: Building - Roof Decking Matt Forsyth 10/15/2021
Passed: Building - Ext Strapping/Wall Sheathing Matt Forsyth 10/15/2021
Passed: Building - Framing Matt Forsyth 11/9/2021
Failed: Mechanical - Rough In No Mechanical Work Started Matt Forsyth 11/9/2021
Passed: Mechanical - Rough In Need Electrical Inspection And Plumbing Before Insulation Troy Crews 11/17/2021
Cancelled: Mechanical - Rough In Troy Crews 11/23/2021
Passed: Electrical - 2nd Rough-In Matt Forsyth 11/24/2021
Passed: Plumbing/Gas - Tub Set/Shower Pan Tub Water Tested Matt Forsyth 11/24/2021
Passed: Building - Insulation Walls Only Matt Forsyth 11/30/2021
Passed: Electrical - Permanent Power Need Septic Release Matt Forsyth 1/28/2022
Release to power company Melissa Garber 2/9/2022
Septic Release Inspection Health Dept 2/9/2022
Failed: Building - Final Need Blower Door Doc Need Ceiling Insulation Replace Old Breaker In Panel (reset Not Working Matt Forsyth 2/23/2022
Passed: Building - Final Matt Forsyth 2/24/2022
Documents
File Name Date File Size
Documentation 20210209 022345.pdf 2025.07.04 2.67MB
Plans 2021-02-11 11.59.07.194.pdf 2023.12.25 1.81MB