| Application #: | 49237 |
| Permit #: |
000041971 |
| Related Permit: |
|
| Submitted: | Thursday, May 6, 2021 |
| Issued: | Thursday, May 20, 2021 |
| Expires: | Tuesday, September 7, 2021 |
| Completed: | Tuesday, September 7, 2021 |
| Status: |
Completed |
| Septic Release? |
Yes |
| Finished floor requirement |
|
| Fema map number |
12023C0195D |
| Type Roofing Job |
Overlay with Metal |
| Type of structure |
House |
| Commercial or Residential |
Residential |
| Roof Area (for this job) Sq Ft |
1700 |
| No. of Stories |
1 |
| Roof Pitch |
4:12 or Greater |
| Is the existing roof being removed? |
No |
| Explain if not removing the existing roofing material? |
overlay with 29 ga galvalume |
| Type of New Roofing Product |
Metal |
| Florida Product Approval Number |
17992.IR2 |
| Product Manufacturer |
Capital Metal |
| Product Description |
29 Gauge Metal |
| Building Code Edition |
2023 Florida Building Code 8th Edition and 2020 National Electrical Code |
| Sealed roof decking options: (Must select an option.) |
Other (explain) |
| Sealed roof decking explanation for other option. |
install pine 1x4s over existing shingles |
| Ventilation: |
Ridge Vent |
| Flashing: |
Replace All |
| Drip Edge: |
Replace All |
| Valley Treatment: |
New Metal |
| Any cable and/or race-way wiring located on or within the roof assembly? |
No |
| 5/6/2021 |
Application pending. |
| 5/6/2021 |
Point Review - Printed-Online Application |
| 5/6/2021 |
Point Review - Reviewed |
| 5/7/2021 |
Plan Review - Reviewed |
| 5/10/2021 |
Zoning Review - Reviewed |
| 5/10/2021 |
Final Review - Documents Required |
| 5/20/2021 |
Permit Issued |
| Name / Business |
License |
Title |
Role |
Brandy Hall H&s Mobile Home Inc
County License & State License Expired. |
IH1126663 |
Mh Installer (ih) |
Contractor |
Glenn Whittington Whittington Electric Inc
|
EC13002957 |
Electrical Contractor |
Subcontractor |
Michael A Boland Ace A/c Of Ocala Llc
|
CAC1817716 |
Cert Class B A/c |
Subcontractor |
| Inspection |
Notes |
Performed By |
Date |
| Passed: Mobile Home - Mobile Home Set-Up Final |
Need Septic Release |
Matt Forsyth |
8/20/2021 |
| Passed: Engineering - Setbacks |
|
Matt Forsyth |
8/20/2021 |
| Release to power company |
|
Melissa Garber |
9/7/2021 |
| Certificate-Release Certificate |
|
Matt Forsyth |
9/7/2021 |
| Septic Release Inspection |
|
Health Dept |
9/7/2021 |