Permit Details

Permit Search

Permit

New Residential Construction

456 SW DURANT ST
FT. WHITE, FL 32038

Permit #
000041963
Application #
49162
Status Completed
  1. Submitted Apr 28, 2021
  2. Issued May 3, 2022
  3. Expires Dec 28, 2022
  4. Completed Jul 1, 2022

Property

Parcel #
14330-208
Owner
Nelson, Keith
Acres
0.75
Subdivision
Fort White Manor & Replat
Zoning
—
Flood zone
X
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0490C
This is the construction of a
Single Family Dwelling
Setbacks Front
25'
Setback Side 1
10'
Setback Side 2
10'
Setbacks Rear
15'
Stories
1
Heated Area (Sqft)
2160
Total Area (Sqft)
2190
Building Height
17
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
21-0297
If Other, explain the use of the structure.
2,190 total area under roof with a 272 sq/ft aluminum covered rear patio - 4 beds - 3 full baths - gas ventless fireplace - pool permitting & install by Aquascape Pools
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.

Status & Review History

  1. Application pending.
  2. Point Review - Printed-Online Application
  3. Plan Review - Reviewed
  4. Zoning Review - Reviewed
  5. Final Review - Reviewed
  6. Final Review - Payment Needed
  7. Permit Issued
  8. Final Review - Payment Needed
  9. Permit Reissued

Contractors

  • Rodney D Wade

    Wade Custom Homes Inc

    License
    CRC1331070
    Title
    Cert. Residential
    Role
    Contractor

    County License & State License & Workers Comp Expired.

  • Paula E Kennedy

    Gainesville Roofing & Co Inc

    License
    CCC1328678
    Title
    Cert. Roofing
    Role
    Subcontractor

    County License & State License & Workers Comp Expired.

  • Jack E Spann Jr

    Creative Designs Electric Lllp

    License
    ER0004625
    Title
    Reg. Electrical
    Role
    Subcontractor

    County License & State License & Workers Comp Expired.

  • Jonathan E Spann

    Spann's Heating & Air Conditioning Inc

    License
    CAC1815959
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

    County License & State License & Liability Insurance & Workers Comp Expired.

  • James Butler Jr

    Butler Plumbing Of Gainesville Inc

    License
    CFC057960
    Title
    Plumbing Contractor
    Role
    Subcontractor

Inspections

  1. Jun 21, 2021

    Failed: Plumbing/Gas - 1st Underground Rough–In

    Incomplete

    Inspected by Anthony Aslan

  2. Jun 25, 2021

    Failed: Plumbing/Gas - 1st Underground Rough–In

    Toilet Pipes Have No Water

    Inspected by Anthony Aslan

  3. Jun 25, 2021

    Failed: Electrical - 1st Underground Rough–In

    No Electric Pipe Installed

    Inspected by Anthony Aslan

  4. Jun 30, 2021

    Failed: Electrical - Temporary Service

    Panel Is Not Secured

    Inspected by Anthony Aslan

  5. Jun 30, 2021

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Anthony Aslan

  6. Jul 6, 2021

    Rescheduled 7/8/2021:Building - Monolithic Slab

    Inspected by Troy Crews

  7. Jul 6, 2021

    Rescheduled 7/8/2021:Engineering - Setbacks

    Inspected by Troy Crews

  8. Jul 6, 2021

    Rescheduled 7/8/2021:Electrical - Temporary Service

    Inspected by Troy Crews

  9. Jul 7, 2021

    Cancelled: Building - Monolithic Slab

    Inspected by Anthony Aslan

  10. Jul 7, 2021

    Cancelled: Engineering - Setbacks

    Inspected by Anthony Aslan

  11. Jul 7, 2021

    Cancelled: Electrical - Temporary Service

    Inspected by Anthony Aslan

  12. Jul 8, 2021

    Failed: Building - Monolithic Slab

    Need To Dig Out Cave Ins And Wash Out By A/c Chase.

    Inspected by Anthony Aslan

  13. Jul 8, 2021

    Failed: Engineering - Setbacks

    Inspected by Anthony Aslan

  14. Jul 8, 2021

    Passed: Electrical - Temporary Service

    Panel Secured.

    Inspected by Anthony Aslan

  15. Jul 8, 2021

    Release to power company

    Inspected by Anthony Aslan

  16. Jul 8, 2021

    Passed: Building - Monolithic Slab

    Inspected by Anthony Aslan

  17. Jul 8, 2021

    Passed: Engineering - Setbacks

    Inspected by Anthony Aslan

  18. Aug 18, 2021

    Failed: Building - Roof Decking

    Sheathing Not Nailed

    Inspected by Anthony Aslan

  19. Aug 18, 2021

    Failed: Building - Wall Sheathing

    Missing Nails Red Marker

    Inspected by Anthony Aslan

  20. Aug 19, 2021

    Passed: Building - Wall Sheathing

    Inspected by Anthony Aslan

  21. Aug 19, 2021

    Passed: Building - Roof Decking

    Sheathing Nailed

    Inspected by Anthony Aslan

  22. Oct 27, 2021

    Passed: Electrical - 2nd Rough-In

    Metal Boxes Not Grounded

    Inspected by Anthony Aslan

  23. Oct 27, 2021

    Passed: Mechanical - Rough In

    Inspected by Anthony Aslan

  24. Oct 27, 2021

    Passed: Plumbing/Gas - 2nd Rough-In

    Pressure On Gauge

    Inspected by Anthony Aslan

  25. Oct 27, 2021

    Passed: Plumbing/Gas - Tub Set/Shower Pan

    Inspected by Anthony Aslan

  26. Oct 27, 2021

    Cancelled: Building - Strapping

    Inspected by Anthony Aslan

  27. Oct 27, 2021

    Passed: Building - Framing

    Inspected by Anthony Aslan

  28. Nov 18, 2021

    Passed: Building - Insulation

    Bat In Whole House

    Inspected by Anthony Aslan

  29. Nov 29, 2021

    Passed: Building - Rated Assembly Fastening

    No Screw Inspection

    Inspected by Troy Crews

  30. Apr 28, 2022

    Cancelled: Electrical - Permanent Power

    Inspected by Emaleigh Williams

  31. Apr 29, 2022

    Failed: Electrical - Permanent Power

    Panel Cover Off And Needs Bonding Screw Removed, Outlets Missing Cover And Not Blanked Off, Need Septic Release

    Inspected by Anthony Aslan

  32. May 3, 2022

    Septic Release Inspection

    Inspected by Health Dept

  33. May 3, 2022

    Passed: Electrical - Permanent Power

    Ground Rods Connected To Buss Needs To Be Contentious, Or Removed

    Inspected by Anthony Aslan

  34. May 3, 2022

    Release to power company

    Inspected by Anthony Aslan

  35. Jul 1, 2022

    Passed: Building - Final

    Inspected by Matt Forsyth

Documents