Permit Details

Permit Search

Permit

New Residential Construction

244 SW BEACON WAY
LAKE CITY, FL 32025

Permit #
000041909
Application #
49090
Status Completed
  1. Submitted Apr 20, 2021
  2. Issued May 13, 2021
  3. Expires May 22, 2023
  4. Completed Nov 23, 2022

Property

Parcel #
02951-106
Owner
Pfs Solutions, Inc
Acres
0.49
Subdivision
Amelia Landing Phase 1
Zoning
PRD
Flood zone
X
District
5

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Subdivision Plat
Finished floor requirement
116'
Requirement needed
By Nailing Inspection
Document needed is
a Surveyor letter giving the Finished Floor Elevation
Document receieved
Yes
Fema map number
12023C0293D
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
25'
Setback Side 1
10'
Setback Side 2
10'
Setbacks Rear
15'
Stories
1
Heated Area (Sqft)
1638
Total Area (Sqft)
2444
Building Height
21
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
x-city
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.

Status & Review History

  1. Application pending.
  2. Point Review - Printed-Online Application
  3. Point Review - Reviewed
  4. Zoning Review - Reviewed
  5. Plan Review - Reviewed
  6. Zoning Review - Reviewed
  7. Final Review - Reviewed
  8. Final Review - Payment Needed
  9. Permit Issued
  10. Final Review - Payment Needed

Contractors

  • Robert S Stewart

    Pfs Solutions Inc

    License
    CBC1252898
    Title
    Building Contractor
    Role
    Contractor

    County License & State License & Liability Insurance & Workers Comp & Employees Workers Comp Expired.

  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Ryan C Beville

    Rbi Electrical Contracting Llc

    License
    EC13004236
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Stephen M Brisbois

    Epic Ac Service (dba) Central Home Heating & Air Llc

    License
    CAC1819412
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

Inspections

  1. Jun 15, 2021

    Passed: Building - Footer

    Inspected by Troy Crews

  2. Jun 15, 2021

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  3. Jul 6, 2021

    Cancelled: Engineering - Setbacks

    Inspected by Janice Williams

  4. Jul 6, 2021

    Cancelled: Building - Footer

    Inspected by Janice Williams

  5. Jul 6, 2021

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Troy Crews

  6. Jul 8, 2021

    Passed: Building - Slab

    Inspected by Troy Crews

  7. Aug 20, 2021

    Passed: Building - Ext Strapping/Wall Sheathing

    Inspected by Troy Crews

  8. Aug 20, 2021

    Failed: Electrical - Temporary Service

    No Pole Installed

    Inspected by Troy Crews

  9. Aug 20, 2021

    Passed: Building - Roof Decking

    Inspected by Troy Crews

  10. Aug 26, 2021

    Passed: Electrical - 2nd Rough-In

    Inspected by Troy Crews

  11. Aug 26, 2021

    Failed: Mechanical - Rough In

    No Mechanical Installed

    Inspected by Troy Crews

  12. Aug 26, 2021

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Troy Crews

  13. Aug 26, 2021

    Failed: Building - Framing

    Truss T-11 Needs Strapping

    Inspected by Troy Crews

  14. Oct 12, 2021

    Failed: Mechanical - Rough In

    No Bath Fans Installed

    Inspected by Troy Crews

  15. Oct 12, 2021

    Passed: Building - Framing

    T11 Truss Strapped

    Inspected by Troy Crews

  16. Oct 20, 2021

    Failed: Mechanical - Rough In

    One Duct Short To Reach Soffit, And Fans Not Wired In. Call Back In With Wall Insulation.

    Inspected by Troy Crews

  17. Jan 14, 2022

    Failed: Building - Insulation

    Not Complete

    Inspected by Troy Crews

  18. Jan 18, 2022

    Passed: Mechanical - Rough In

    Items Corrected

    Inspected by Troy Crews

  19. Jan 18, 2022

    Passed: Building - Insulation

    Walls Only

    Inspected by Troy Crews

  20. Jun 14, 2022

    Passed: Electrical - Permanent Power

    House Must Have Water And Sewer Connected Prior To Final

    Inspected by Troy Crews

  21. Jun 14, 2022

    Release to power company

    Inspected by Troy Crews

  22. Sep 23, 2022

    Failed: Building - Final

    Need Final Termite Treat, Blower Door Test, Handrail Upstairs To Bonus Room, Need To Complete

    Inspected by Troy Crews

  23. Oct 17, 2022

    Failed: Building - Final

    Need Dryer Vent Installed.

    Inspected by Troy Crews

  24. Nov 3, 2022

    Failed: Building - Final

    House Lock

    Inspected by Troy Crews

  25. Nov 23, 2022

    Passed: Building - Final

    Dryer Vent Installed

    Inspected by Troy Crews

Documents