Inspection |
Notes |
Performed By |
Date |
Passed: Building - Footer |
|
Troy Crews |
6/2/2021 |
Passed: Engineering - Setbacks |
|
Troy Crews |
6/2/2021 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
6/29/2021 |
Passed: Building - Slab |
|
Troy Crews |
7/8/2021 |
Failed: Electrical - Temporary Service |
No Pole Found |
Troy Crews |
7/14/2021 |
Passed: Building - Ext Strapping/Wall Sheathing |
|
Troy Crews |
8/20/2021 |
Failed: Electrical - Temporary Service |
No Pole On Site |
Troy Crews |
8/20/2021 |
Passed: Building - Roof Decking |
|
Troy Crews |
8/20/2021 |
Cancelled: Electrical - 1st Underground Rough–In |
|
Troy Crews |
8/25/2021 |
Passed: Electrical - Temporary Service |
|
Troy Crews |
8/26/2021 |
Release to power company |
|
Troy Crews |
8/26/2021 |
Passed: Electrical - 2nd Rough-In |
|
Troy Crews |
8/26/2021 |
Failed: Mechanical - Rough In |
No Mechanical Installed |
Troy Crews |
8/26/2021 |
Passed: Building - Framing |
|
Troy Crews |
8/26/2021 |
Passed: Mechanical - Rough In |
|
Troy Crews |
10/12/2021 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Troy Crews |
10/12/2021 |
Cancelled: Building - Insulation |
|
Troy Crews |
2/8/2022 |
Passed: Building - Insulation |
|
Troy Crews |
2/8/2022 |
Passed: Electrical - Permanent Power |
|
Troy Crews |
7/11/2022 |
Release to power company |
|
Troy Crews |
7/11/2022 |
Failed: Building - Final |
House Locked, Also Need Landing Outside Side Door Of Garage. |
Troy Crews |
11/3/2022 |
Failed: Building - Final |
Seal A.c. Chase Line Outside, Put P Trap Condensate Line Outside, Fire Box Has Valve Inside Fire Box Need Product Manual Paperwork That Ok"s This, Also Power Not Connected To Fire Box Blower, Bottom Step At Stairs Is Over 7.75 Inch Maximum Also Check Top Step. |
Troy Crews |
12/15/2022 |
Failed: Building - Final |
Need Termite Final (rec'd) And Address Stairs. |
Troy Crews |
12/27/2022 |
Passed: Building - Final |
Bottom Riser Addresed. |
Troy Crews |
1/12/2023 |