Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 161 SW YULAN ST, UNITS 100 & 102
FORT WHITE, FL 32038
Parcel #: 14448-000
Acres: 1.01
Owner: Crb Investments Properties Llc
Subdivision: Town Of Fort White
Zoning: RSF-2
Flood Zone: X
District: 2
Application #: 48949
Permit #: 000041820
Related Permit:
Submitted: Wednesday, December 29, 2021
Issued: Thursday, April 14, 2022
Expires: Wednesday, August 24, 2022
Completed: Wednesday, August 24, 2022
Status: Completed
Septic Release? Yes
Notes:
PERMIT RENEWED 4/14/2022
Job Details
Elevation regulation Minimum Requirement
Finished floor requirement TOWN OF FORT WHITE REQUIREMENTS
Fema map number 12023C0490C
This is the construction of a Duplex
Setbacks Front FW-25'
Setback Side 1 FW-10'
Setback Side 2 FW-10'
Setbacks Rear FW-15'
Stories 1
Heated Area (Sqft) 2006
Total Area (Sqft) 2188
Building Height 16
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title multi family
Building Code Edition 2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000) 21-0170
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition) two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Review Notes
4/7/2021 Point Review - Received-Hard Copy Application
4/7/2021 Final Review - Documents Required NEED: ESTIMATED COST OF CONSTRUCTION, SUBCONTRACTOR FORM, APPROVED SEPTIC PAPERWORK, NEW ROOF REQUIREMENT PAGE, PAGE A.2 NEEDS TO BE SIGNED BY MR. GEISLER AND RETURNED FOR THIS APP.
4/7/2021 Zoning Review - Reviewed NEED: ESTIMATED COST OF CONSTRUCTION, SUBCONTRACTOR FORM, APPROVED SEPTIC PAPERWORK, NEW ROOF REQUIREMENT PAGE, PAGE A.2 NEEDS TO BE SIGNED BY MR. GEISLER AND RETURNED FOR THIS APP.
4/20/2021 Plan Review - Reviewed NEED: ESTIMATED COST OF CONSTRUCTION, SUBCONTRACTOR FORM, APPROVED SEPTIC PAPERWORK, NEW ROOF REQUIREMENT PAGE, PAGE A.2 NEEDS TO BE SIGNED BY MR. GEISLER AND RETURNED FOR THIS APP.
4/20/2021 Plan Review - Reviewed NEED: ESTIMATED COST OF CONSTRUCTION, SUBCONTRACTOR FORM, APPROVED SEPTIC PAPERWORK, NEW ROOF REQUIREMENT PAGE, PAGE A.2 NEEDS TO BE SIGNED BY MR. GEISLER AND RETURNED FOR THIS APP.
4/20/2021 Final Review - Documents Required NEED: ESTIMATED COST OF CONSTRUCTION, SUBCONTRACTOR FORM, APPROVED SEPTIC PAPERWORK, NEW ROOF REQUIREMENT PAPER. A-2 IS IN OUR FILE
4/26/2021 Final Review - Reviewed NEEDED: ROOFING CONTRACTOR ON FILE (KIRBY'S ROOFING & CONSTRUCTION) OR LICENSED AND REGISTERED CONTRACTOR TO SIGN SUB VF
4/27/2021 Final Review - Payment Needed
4/28/2021 Permit Issued Permit #000041820 created and approved.
4/14/2022 Permit Renewed Permit renewed. Original approved date of 4/28/2021 expired on 12/5/2021
4/14/2022 Permit Renewed Permit renewed. Original approved date of 4/14/2022 expired on 10/11/2022
6/29/2022 Final Review - Payment Needed
Contractors
Name/ Business License Title Role
James Lipscomb
Lipscomb & Eagle Development Inc
County License & State License & Liability Insurance & Workers Comp Expired.
CBC1253543 Building Contractor Contractor
Everton D Ruddock
D&s Lighting Inc
EC13003800 Electrical Contractor Subcontractor
Anthony R Franks
Franks & Lane Heating And Air Llc
CAC1818631 Cert. A/c Class “b” Subcontractor
Cody Barrs
Barrs Plumbing Inc
CFC1427145 Plumbing Contractor Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Plumbing/Gas - 1st Underground Rough–In Anthony Aslan 6/2/2021
Passed: Electrical - Temporary Service Anthony Aslan 6/2/2021
Release to power company Anthony Aslan 6/2/2021
Passed: Engineering - Setbacks Anthony Aslan 6/8/2021
Passed: Building - Monolithic Slab Need Grounding Wire Anthony Aslan 6/8/2021
Release to power company Duke Energy States To Owner Theu Never Rec'd Temp. Power release. Anthony Aslan 7/8/2021
Rescheduled 4/20/2022:Building - Wall Sheathing Anthony Aslan 4/20/2022
Passed: Building - Wall Sheathing Anthony Aslan 4/20/2022
Cancelled: Building - Ext Strapping/Wall Sheathing Anthony Aslan 4/20/2022
Passed: Building - Roof Decking Anthony Aslan 5/4/2022
Passed: Building - Framing Anthony Aslan 5/4/2022
Passed: Building - Fire Rated Wall Anthony Aslan 5/23/2022
Passed: Mechanical - Rough In Anthony Aslan 5/23/2022
Passed: Electrical - 2nd Rough-In Anthony Aslan 5/23/2022
Passed: Plumbing/Gas - 2nd Rough-In Anthony Aslan 5/23/2022
Passed: Building - Insulation Anthony Aslan 5/23/2022
Passed: Electrical - Permanent Power Wires In Kitchens Need Safety Off Anthony Aslan 6/29/2022
Release to power company Anthony Aslan 6/29/2022
Passed: Building - Final Gfic Left Unit Porch Not Reseting Anthony Aslan 8/24/2022
Documents
File Name Date File Size