New Residential Construction
Permit
| Application #: | 48921 |
| Permit #: |
000041791 |
| Related Permit: |
|
| Submitted: | Friday, October 15, 2021 |
| Issued: | Friday, April 23, 2021 |
| Expires: | Friday, October 15, 2021 |
| Completed: | Friday, October 15, 2021 |
| Status: |
Completed |
| Septic Release? |
Yes |
Job Details
| Elevation regulation |
Minimum Requirement |
| Finished floor requirement |
One foot above the road |
| Fema map number |
12023C0270C |
| In floodway |
N |
| This is the construction of a |
Single Family Dwelling |
| Setbacks Front |
30' |
| Setback Side 1 |
25' |
| Setback Side 2 |
25' |
| Setbacks Rear |
25' |
| Stories |
1 |
| Heated Area (Sqft) |
1260 |
| Total Area (Sqft) |
2016 |
| Building Height |
16 |
| Building Code Construction Type |
V |
| Building Code Element |
B |
| Building Code Occupancy Types |
Residential |
| Occupancy Use Title |
single family dwelling |
| Building Code Edition |
2020 Florida Building Code 7th Edition and 2017 National Electrical Code |
| Septic# (00-0000) or (X00-000) |
21-0179 |
| Sealed roof decking options. (Must select one option per FBC 2023 8th Edition) |
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified. |
Review Notes
| 4/9/2021 |
Point Review - Printed-Online Application |
| 4/9/2021 |
Point Review - Reviewed |
| 4/13/2021 |
Zoning Review - Reviewed |
| 4/20/2021 |
Plan Review - Reviewed |
| 4/22/2021 |
Zoning Review - Reviewed |
| 4/22/2021 |
Final Review - Reviewed |
| 4/22/2021 |
Final Review - Payment Needed |
| 4/23/2021 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Brian T Giebeig Trent Giebeig Construction,inc.
Liability Insurance Expired. |
CRC1330693 |
Residential Contractor |
Contractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Building - Footer |
|
Matt Forsyth |
4/27/2021 |
| Passed: Engineering - Setbacks |
|
Matt Forsyth |
4/27/2021 |
| Passed: Electrical - Temporary Service |
|
Matt Forsyth |
4/27/2021 |
| Release to power company |
|
Matt Forsyth |
4/27/2021 |
| Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Matt Forsyth |
5/5/2021 |
| Passed: Building - Slab |
|
Matt Forsyth |
5/7/2021 |
| Passed: Building - Roof Decking |
|
Troy Crews |
6/18/2021 |
| Passed: Building - Wall Sheathing |
|
Troy Crews |
6/18/2021 |
| Passed: Building - Framing |
|
Matt Forsyth |
6/29/2021 |
| Passed: Electrical - Temporary Service |
|
Matt Forsyth |
6/29/2021 |
| Release to power company |
|
Matt Forsyth |
6/29/2021 |
| Passed: Electrical - 2nd Rough-In |
|
Matt Forsyth |
7/6/2021 |
| Passed: Plumbing/Gas - 2nd Rough-In |
|
Matt Forsyth |
7/6/2021 |
| Failed: Mechanical - Rough In |
Need Exhaust Fan Ductwork Will Inspect On Insulation Inspection |
Matt Forsyth |
7/6/2021 |
| Passed: Mechanical - Rough In |
|
Matt Forsyth |
7/29/2021 |
| Passed: Building - Insulation |
Walls And Vaulted Ceiling |
Matt Forsyth |
7/29/2021 |
| Septic Release Inspection |
|
Health Dept |
8/27/2021 |
| Passed: Electrical - Permanent Power |
|
Matt Forsyth |
9/21/2021 |
| Release to power company |
|
Matt Forsyth |
9/21/2021 |
| Passed: Building - Final |
|
Matt Forsyth |
10/15/2021 |