Inspection |
Notes |
Performed By |
Date |
Septic Release Inspection |
|
Health Dept |
4/13/2021 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
Compaction Test Will Be Required For Mono Slab |
Troy Crews |
5/10/2021 |
Passed: Building - Monolithic Slab |
|
Troy Crews |
5/17/2021 |
Passed: Engineering - Setbacks |
|
Troy Crews |
5/17/2021 |
Passed: Building - Ext Strapping/Wall Sheathing |
Gables Flat Strapped |
Troy Crews |
6/2/2021 |
Passed: Building - Roof Decking |
|
Troy Crews |
6/2/2021 |
Passed: Building - Wall Sheathing |
|
Troy Crews |
6/2/2021 |
Passed: Building - Framing |
Add Strap At Header, N.w. Bedroom Window |
Troy Crews |
6/7/2021 |
Passed: Electrical - 2nd Rough-In |
|
Anthony Aslan |
6/10/2021 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Anthony Aslan |
6/10/2021 |
Failed: Mechanical - Rough In |
1) Dryer Pipe Not In The Direction Of Air Flow.
2) Main Return Missing Gasket Material
3) Bath Venting Not Strapped
4) Kitchen Exhaust Duct Can't Be Strapped With Black Strap Must Be Metal And Screws Missing For Seam Joints
5) Supply Truck Must Have Turning Vanes In 90 Degree Duct Transitions.
6) Duct Connection Need To Be Sealed With 181 Tape.
|
Anthony Aslan |
6/10/2021 |
Passed: Mechanical - Rough In |
Items Corrected, Reminder Air Handler In Attic Notice Posted Prior To Final On Panel Box. |
Troy Crews |
6/16/2021 |
Passed: Building - Insulation |
|
Troy Crews |
6/17/2021 |
Failed: Electrical - Permanent Power |
House Needs Door Locks And All Exposed Wires Need Caps Or Tape. |
Troy Crews |
9/28/2021 |
Passed: Electrical - Permanent Power |
|
Troy Crews |
10/5/2021 |
Release to power company |
|
Troy Crews |
10/5/2021 |
Passed: Building - Final |
Need Blower Door Test To Release C.o. |
Troy Crews |
10/29/2021 |
Certificate-Release Certificate |
Blower Door Received |
Troy Crews |
11/1/2021 |