Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 198 SW GOVERNORS GLN
LAKE CITY, FL 32024
Parcel #: 03406-107
Acres: 5.00
Owner: Gregory And Dainelle Poole
Subdivision: Rose Creek Plantation Phase 1
Zoning: A-3
Flood Zone: X
District: 5
Application #: 48641
Permit #: 000041785
Related Permit: Culvert: 000041786
Submitted: Friday, March 5, 2021
Issued: Thursday, April 22, 2021
Expires: Thursday, February 24, 2022
Completed: Thursday, February 24, 2022
Status: Completed
Septic Release? Yes
Notes:

Job Details
Elevation regulation Minimum Requirement
Finished floor requirement One foot above the road
Fema map number 12023C0383D
In floodway N
This is the construction of a Single Family Dwelling
Setbacks Front 30'
Setback Side 1 25'
Setback Side 2 25'
Setbacks Rear 25'
Stories 2
Heated Area (Sqft) 2446
Total Area (Sqft) 3902
Building Height 24
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title single family
Building Code Edition 2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000) 21-0199
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition) two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Review Notes
3/4/2021 Application pending.
3/5/2021 Point Review - Printed-Online Application
3/9/2021 Zoning Review - Corrections Needed
3/23/2021 Plan Review - Documents Required
3/25/2021 Plan Review - Documents Required
3/30/2021 Plan Review - Documents Required
3/31/2021 Zoning Review - Corrections Needed
4/16/2021 Plan Review - Reviewed
4/19/2021 Zoning Review - Corrections Needed
4/19/2021 Point Review - Printed-Online Application
4/19/2021 Point Review - Printed-Online Application
4/19/2021 Zoning Review - Corrections Needed
4/21/2021 Zoning Review - Corrections Needed
4/21/2021 Zoning Review - Reviewed
4/21/2021 Final Review - Documents Required
4/22/2021 Final Review - Payment Needed
4/22/2021 Permit Issued
2/2/2022 Final Review - Payment Needed
Contractors
Name/ Business License Title Role
Isaiah Cully
Ic Construction Llc
CBC1259655 Building Contractor Contractor
Cody Barrs
Barrs Plumbing Inc
CFC1427145 Plumbing Contractor Subcontractor
Tyler M Turner
Tmt Roofing Llc
CCC1330410 Cert Roofing Subcontractor
Everton D Ruddock
D&s Lighting Inc
EC13003800 Electrical Contractor Subcontractor
Clinton G Wilson
Wilson Heat & Air Inc
CAC057886 Class B A/c Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Initial Driveway Mccormick, David 4/23/2021
Passed: Building - Footer Troy Crews 6/1/2021
Passed: Engineering - Setbacks Troy Crews 6/1/2021
Passed: Plumbing/Gas - 1st Underground Rough–In Matt Forsyth 6/30/2021
Passed: Building - Slab Matt Forsyth 7/9/2021
Passed: Electrical - Temporary Service Matt Forsyth 7/26/2021
Release to power company Matt Forsyth 7/26/2021
Passed: Building - Wall Sheathing Matt Forsyth 7/29/2021
Passed: Building - Roof Decking Matt Forsyth 9/1/2021
Passed: Building - Framing Matt Forsyth 9/7/2021
Passed: Plumbing/Gas - 2nd Rough-In Vent Stack Came Apart In Master Bedrm Matt Forsyth 10/21/2021
Passed: Electrical - 2nd Rough-In Matt Forsyth 10/21/2021
Passed: Building - Framing Threaded Rod Used Matt Forsyth 10/21/2021
Passed: Building - Insulation Matt Forsyth 11/1/2021
Passed: Mechanical - Rough In Ductwork Only Matt Forsyth 11/1/2021
Septic Release Inspection Health Dept 12/16/2021
Passed: Engineering - Final Driveway Smith, Blake 1/10/2022
Passed: Electrical - Permanent Power Anthony Aslan 2/3/2022
Release to power company Anthony Aslan 2/3/2022
Passed: Building - Final Matt Forsyth 2/24/2022
Documents