Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 224 SW CEDARWOOD GLN
LAKE CITY, FL 32025
Parcel #: 09415-109
Acres: 5.01
Owner: Mueller Tamela Illene & Mueller Lavern Allen
Subdivision: Magnolia Place
Zoning: A-3
Flood Zone: X
District: 4
Application #: 48767
Permit #: 000041760
Related Permit:
Submitted: Sunday, March 28, 2021
Issued: Monday, April 19, 2021
Expires: Wednesday, February 23, 2022
Completed: Wednesday, February 23, 2022
Status: Completed
Septic Release? Yes
Notes:
BUILDER CONFIRMED 1 FT. ABOVE RD FINISHED FLOOR
Job Details
Elevation regulation Subdivision Plat
Finished floor requirement HIGHER OF ELEVATION 116' OR 1 FOOT ABOVE THE ROADWAY OR 8 INCHES ABOVE THE HIGHEST ADJACENT GRADE
Requirement needed By Nailing Inspection
Document needed is a Surveyor letter giving the Finished Floor Elevation
Document receieved NA
Fema map number 12023C0415C
In floodway N
This is the construction of a Single Family Dwelling
Setbacks Front 30'
Setback Side 1 25'
Setback Side 2 25'
Setbacks Rear 30'(utility easement)
Stories 1
Heated Area (Sqft) 2436
Total Area (Sqft) 3713
Building Height 28
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title single family
Building Code Edition 2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000) 21-0305
Review Notes
3/18/2021 Application pending.
3/29/2021 Point Review - On Hold-Incomplete
3/30/2021 Point Review - Printed-Online Application
3/31/2021 Zoning Review - Reviewed
4/8/2021 Plan Review - Reviewed
4/19/2021 Zoning Review - Reviewed
4/19/2021 Final Review - Payment Needed
4/19/2021 Permit Issued
12/6/2021 Final Review - Payment Needed
Contractors
Name/ Business License Title Role
Daniel Weiland
D. Weiland Plumbing,llc.
Liability Insurance & Workers Comp Expired.
CFC1426221 Plumbing Contractor Subcontractor
Lee A Holloway
Ldm Construction Company Inc & Peninsular Electric Co
CGC1510178 General Contractor Contractor
Clinton G Wilson
Wilson Heat & Air Inc
CAC057886 Class B A/c Subcontractor
Donald Davis
High Springs Electric Inc
EC0002306 Electrical Contractor Subcontractor
Inspections
Inspection Notes Performed By Date
Failed: Electrical - Temporary Service Needs New Weatherhead Troy Crews 4/23/2021
Passed: Electrical - Temporary Service Troy Crews 4/26/2021
Release to power company Troy Crews 4/26/2021
Passed: Plumbing/Gas - 1st Underground Rough–In Troy Crews 6/1/2021
Passed: Building - Monolithic Slab Troy Crews 6/14/2021
Passed: Engineering - Setbacks Troy Crews 6/14/2021
Passed: Electrical - 1st Underground Rough–In Troy Crews 6/14/2021
Cancelled: Plumbing/Gas - 1st Underground Rough–In Troy Crews 6/14/2021
Passed: Building - Ext Strapping/Wall Sheathing Troy Crews 8/9/2021
Passed: Building - Roof Decking Contractor Has Shown Floor To Be 1ft. Above Rd. Troy Crews 8/9/2021
Failed: Building - Framing Several Anchor Bolts Missing, Call Back In With Mechanicals Troy Crews 8/31/2021
Passed: Building - Framing Troy Crews 9/7/2021
Passed: Electrical - 2nd Rough-In Troy Crews 9/7/2021
Passed: Mechanical - Rough In Troy Crews 9/7/2021
Passed: Plumbing/Gas - 2nd Rough-In Troy Crews 9/7/2021
Passed: Building - Insulation Troy Crews 9/24/2021
Passed: Electrical - Permanent Power Need Septic Final Troy Crews 12/7/2021
Release to power company Melissa Garber 12/8/2021
Septic Release Inspection Health Dept 12/8/2021
Passed: Building - Final Troy Crews 2/22/2022