New Residential Construction
Permit
| Application #: | 48995 |
| Permit #: |
000041752 |
| Related Permit: |
|
| Submitted: | Monday, November 15, 2021 |
| Issued: | Friday, April 16, 2021 |
| Expires: | Monday, November 22, 2021 |
| Completed: | Monday, November 22, 2021 |
| Status: |
Completed |
| Septic Release? |
Yes |
Job Details
| Elevation regulation |
Minimum Requirement |
| Finished floor requirement |
One foot above the road |
| Fema map number |
12023C0390C |
| In floodway |
N |
| This is the construction of a |
Single Family Dwelling |
| Setbacks Front |
30' |
| Setback Side 1 |
25' |
| Setback Side 2 |
25' |
| Setbacks Rear |
25' |
| Stories |
1 |
| Heated Area (Sqft) |
1799 |
| Total Area (Sqft) |
3575 |
| Building Height |
19 |
| Building Code Construction Type |
V |
| Building Code Element |
B |
| Building Code Occupancy Types |
Residential |
| Occupancy Use Title |
single family |
| Building Code Edition |
2020 Florida Building Code 7th Edition and 2017 National Electrical Code |
| Septic# (00-0000) or (X00-000) |
20-0681 |
Review Notes
| 4/12/2021 |
Point Review - Status Cleared |
| 4/12/2021 |
Point Review - Printed-Online Application |
| 4/12/2021 |
Point Review - Reviewed |
| 4/12/2021 |
Zoning Review - Reviewed |
| 4/12/2021 |
Plan Review - Documents Required |
| 4/16/2021 |
Plan Review - Reviewed |
| 4/16/2021 |
Final Review - Reviewed |
| 4/16/2021 |
Permit Issued |
| 11/10/2021 |
Final Review - Payment Needed |
Contractors
| Name / Business |
License |
Title |
Role |
Thomas Bucchi Ace Heat & Air Inc.
Liability Insurance Expired. |
CAC058170 |
Class B A/c Contractor |
Subcontractor |
Jack Phillips J Phillips Electric Inc
|
EC13004335 |
Cert. Electrical |
Subcontractor |
Lewis G Walker Lewis Walker Roofing Inc
|
RC0067442 |
Roofing Contractor |
Subcontractor |
Cody Barrs Barrs Plumbing Inc
|
CFC1427145 |
Plumbing Contractor |
Subcontractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Building - Footer |
|
Matt Forsyth |
4/20/2021 |
| Passed: Engineering - Setbacks |
|
Matt Forsyth |
4/20/2021 |
| Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Matt Forsyth |
5/5/2021 |
| Passed: Building - Slab |
|
Matt Forsyth |
5/10/2021 |
| Passed: Building - Ext Strapping/Wall Sheathing |
|
Matt Forsyth |
7/22/2021 |
| Passed: Building - Roof Decking |
|
Matt Forsyth |
7/22/2021 |
| Passed: Plumbing/Gas - 2nd Rough-In |
|
Matt Forsyth |
7/29/2021 |
| Passed: Building - Framing |
|
Matt Forsyth |
8/3/2021 |
| Passed: Electrical - 2nd Rough-In |
|
Matt Forsyth |
8/9/2021 |
| Passed: Mechanical - Rough In |
|
Matt Forsyth |
8/9/2021 |
| Passed: Building - Insulation |
|
Matt Forsyth |
8/12/2021 |
| Septic Release Inspection |
|
Health Dept |
10/27/2021 |
| Passed: Electrical - Permanent Power |
|
Matt Forsyth |
11/10/2021 |
| Release to power company |
|
Matt Forsyth |
11/10/2021 |
| Passed: Building - Final |
Need Locking Caps Condenser, Blower Door Test |
Anthony Aslan |
11/16/2021 |
| Certificate-Release Certificate |
|
Anthony Aslan |
11/22/2021 |