| Passed: Electrical - Temporary Service |
|
Anthony Aslan |
4/30/2021 |
| Release to power company |
|
Anthony Aslan |
4/30/2021 |
| Failed: Plumbing/Gas - 1st Underground Rough–In |
No Pressure Or Low Pressure On Supply Lines |
Anthony Aslan |
4/30/2021 |
| Passed: Plumbing/Gas - 1st Underground Rough–In |
Need Porta Potty, Not On Site |
Anthony Aslan |
5/4/2021 |
| Passed: Building - Slab |
|
Anthony Aslan |
5/11/2021 |
| Passed: Building - Slab |
Front And Back Proches |
Anthony Aslan |
5/17/2021 |
| Cancelled: Building - Roof Decking |
|
Anthony Aslan |
5/25/2021 |
| Passed: Building - Wall Sheathing |
|
Anthony Aslan |
5/25/2021 |
| Passed: Building - Roof Decking |
|
Anthony Aslan |
6/8/2021 |
| Passed: Electrical - 2nd Rough-In |
|
Anthony Aslan |
6/24/2021 |
| Passed: Mechanical - Rough In |
Need Straps On Exhaust Fan And Dryer Piping |
Anthony Aslan |
6/24/2021 |
| Passed: Plumbing/Gas - 2nd Rough-In |
Need To Do Shower Pan And Tub Test Separate Inspections |
Anthony Aslan |
6/24/2021 |
| Passed: Building - Framing |
Partial Inspection, Anchor Bolt Garage Splice, Missing Back And Front Doors, Missing 2 Windows, Letter From Engineer |
Anthony Aslan |
6/24/2021 |
| Passed: Building - Insulation |
|
Anthony Aslan |
6/29/2021 |
| Septic Release Inspection |
|
Health Dept |
8/12/2021 |
| Passed: Electrical - Permanent Power |
|
Anthony Aslan |
8/25/2021 |
| Release to power company |
|
Anthony Aslan |
8/25/2021 |
| Passed: Building - Final |
Hose Bib Pictures Blower Door, |
Anthony Aslan |
9/28/2021 |
| Certificate-Release Certificate |
|
Anthony Aslan |
9/29/2021 |