Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 908 SW PAUL PEARCE LN
LAKE CITY, FL 32024
Parcel #: 09298-001
Acres: 4.94
Owner: Sullivan Brett And Stephanie
Subdivision:
Zoning: A-3
Flood Zone: X
District: 4
Application #: 48856
Permit #: 000041688
Related Permit:
Submitted:
Issued: Wednesday, April 7, 2021
Expires: Tuesday, October 5, 2021
Completed: Tuesday, October 5, 2021
Status: Completed
Septic Release? Yes
Notes:
LINEAL DESCENDANTS LOT SPLIT
Job Details
This is the construction of a Single Family Dwelling
Heated Area (Sqft) 2192
Total Area (Sqft) 3158
Stories 1
Building Height 17
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title single family
Setbacks Front 30'
Setback Side 1 25'
Setback Side 2 25'
Setbacks Rear 25'
Septic# (00-0000) or (X00-000) 21-0266
Building Code Edition 2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Elevation regulation Minimum Requirement
Finished floor requirement One foot above the road
Fema map number 12023C0395C
In floodway N
Sealed roof decking options. (Must select one option per FBC 2020 7th Edition) two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Review Notes
3/26/2021 Point Review - Received-Hard Copy Application
3/30/2021 Zoning Review - Reviewed
4/6/2021 Plan Review - Reviewed
4/6/2021 Zoning Review - Reviewed DEEDS AND EASEMENTS HAVE BEEN RECORDED AND ARE INCLUDED WITH THE PERMIT DOCUMENTS. LH & BS (4.6.21)
4/6/2021 Final Review - Payment Needed DEEDS AND EASEMENTS HAVE BEEN RECORDED AND ARE INCLUDED WITH THE PERMIT DOCUMENTS. LH & BS (4.6.21)
4/7/2021 Final Review - Payment Needed DEEDS AND EASEMENTS HAVE BEEN RECORDED AND ARE INCLUDED WITH THE PERMIT DOCUMENTS. LH & BS (4.6.21)
4/7/2021 Permit Issued Permit #000041688 created and approved.
9/8/2021 Final Review - Payment Needed DEEDS AND EASEMENTS HAVE BEEN RECORDED AND ARE INCLUDED WITH THE PERMIT DOCUMENTS. LH & BS (4.6.21)
Contractors
Name/ Business License Title Role
Brian T Giebeig
Trent Giebeig Construction,inc.
CRC1330693 Residential Contractor Contractor
Everton D Ruddock
D&s Lighting Inc
EC13003800 Electrical Contractor Subcontractor
Derrick L Williams
Dl Williams Heating & Cooling Llc
CAC1816913 Class "b" A/c Contractor Subcontractor
Kenneth R Roche
Ken Roche Plumbing Inc Dba Plumbing Now
CFC1426527 Plumbing Contractor Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Building - Footer Troy Crews 4/8/2021
Passed: Engineering - Setbacks Troy Crews 4/8/2021
Passed: Electrical - Temporary Service Troy Crews 4/14/2021
Release to power company Troy Crews 4/14/2021
Passed: Plumbing/Gas - 1st Underground Rough–In Troy Crews 4/14/2021
Passed: Building - Slab Troy Crews 4/16/2021
Passed: Building - Roof Decking Anthony Aslan 5/28/2021
Passed: Building - Ext Strapping/Wall Sheathing Need Detail For Porch Beam Strapping Anthony Aslan 5/28/2021
Passed: Electrical - 2nd Rough-In Anthony Aslan 6/23/2021
Failed: Mechanical - Rough In Missing Exhaust Duct On Hall Bath exhaust Venting Not Strapped, Missing 181 Tape On Exhaust Fan. Anthony Aslan 6/23/2021
Failed: Plumbing/Gas - 2nd Rough-In Shower Valves Not Installed Anthony Aslan 6/23/2021
Passed: Plumbing/Gas - Tub Set/Shower Pan Anthony Aslan 6/23/2021
Passed: Building - Framing Anthony Aslan 6/23/2021
Passed: Building - Strapping Anthony Aslan 6/23/2021
Passed: Building - Insulation Troy Crews 6/28/2021
Passed: Mechanical - Rough In Items Corrected Troy Crews 6/28/2021
Passed: Plumbing/Gas - 2nd Rough-In Completed Troy Crews 6/28/2021
Septic Release Inspection Health Dept 9/9/2021
Passed: Electrical - Permanent Power Troy Crews 9/9/2021
Release to power company Troy Crews 9/9/2021
Passed: Building - Final Need Blower Door Test For Release Troy Crews 10/4/2021
Certificate-Release Certificate Blower Door Received Troy Crews 10/5/2021