Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Swimming Pool and Spa Permit

Address 315 SW STILLVIEW GLN
FORT WHITE, FL 32038
Parcel #: 03815-117
Acres: 10.01
Owner: Reddoch Russell Ware & Reddoch Lor Ruth
Subdivision: Cardinal Farms Unr
Zoning: A-3
Flood Zone: X
District: 4
Application #: 48876
Permit #: 000041683
Related Permit:
Submitted: Monday, March 29, 2021
Issued: Wednesday, April 7, 2021
Expires: Wednesday, July 28, 2021
Completed: Wednesday, July 28, 2021
Status: Completed
Septic Release? Yes
Notes:

Job Details
Finished floor requirement
Fema map number 12023C0485C
In floodway N
Is this for residential or commercial use? Residential
This is the construction of a: Pool
ADA Compliant No
Setbacks Front 30'
Setback Side 1 25'
Setbacks Rear 25'
Setback Side 2 25'
Building Code Edition 2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000) 20-0811
Review Notes
3/29/2021 Application pending.
3/30/2021 Point Review - Printed-Online Application
3/31/2021 Zoning Review - Reviewed NEEDED: ENV HEALTH
4/7/2021 Plan Review - Reviewed
4/7/2021 Final Review - Payment Needed
4/7/2021 Permit Issued Permit #000041683 created and approved.
Contractors
Name/ Business License Title Role
Susan Fraze
Aquatic Art Pools & Spas Llc
CPC1457969 Comm. Pool/spa Contractor Contractor
Marcus Matthews
Matthews Electric Llc
EC13005459 Electrical Contractor Subcontractor
Inspections
Inspection Notes Performed By Date
Septic Release Inspection Health Dept 4/1/2021
Passed: Swimming Pool - Pool Steel and Ground Anthony Aslan 4/19/2021
Passed: Engineering - Setbacks Anthony Aslan 4/19/2021
Passed: Swimming Pool - Pool Deck/Piping Pressure Anthony Aslan 6/17/2021
Passed: Swimming Pool - Pool Safety and Final Recv'd Picture For Master Bedroom Door. Anthony Aslan 7/28/2021