| Passed: Building - Footer |
|
Troy Crews |
5/24/2021 |
| Passed: Engineering - Setbacks |
|
Troy Crews |
5/24/2021 |
| Passed: Plumbing/Gas - 1st Underground Rough–In |
P Trap Underslab |
Matt Forsyth |
7/6/2021 |
| Passed: Building - Slab |
|
Anthony Aslan |
7/12/2021 |
| Passed: Building - Ext Strapping/Wall Sheathing |
Front Porch Strap Missing On Post, Several Straps Not Nailed To Post |
Anthony Aslan |
8/13/2021 |
| Passed: Building - Roof Decking |
|
Anthony Aslan |
8/13/2021 |
| Failed: Building - Framing |
Need Anchor Bolts Slices In Bottom Plate 4" Min 12" Max. Missing Anchor Bolts 42" Center. Marked With Red X. |
Anthony Aslan |
8/17/2021 |
| Passed: Building - Framing |
Installed Anchor Bolts, Windows Not Installed |
Anthony Aslan |
8/24/2021 |
| Passed: Electrical - 2nd Rough-In |
|
Matt Forsyth |
9/14/2021 |
| Passed: Mechanical - Rough In |
|
Matt Forsyth |
9/14/2021 |
| Passed: Plumbing/Gas - 2nd Rough-In |
|
Matt Forsyth |
9/14/2021 |
| Passed: Building - Lath/Stucco |
|
Anthony Aslan |
9/17/2021 |
| Passed: Building - Insulation |
Walls Only |
Anthony Aslan |
9/17/2021 |
| Septic Release Inspection |
|
Health Dept |
11/8/2021 |
| Cancelled: Electrical - Temporary Service |
|
Anthony Aslan |
11/22/2021 |
| Passed: Electrical - Permanent Power |
|
Anthony Aslan |
11/22/2021 |
| Release to power company |
|
Anthony Aslan |
11/22/2021 |
| Rescheduled 1/5/2022:Building - Final |
|
Matt Forsyth |
1/4/2022 |
| Passed: Building - Final |
|
Matt Forsyth |
1/5/2022 |