Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 395 SW MARYNIK DR
HIGH SPRINGS, FL 32643
Parcel #: 10006-205
Acres: 5.10
Owner: Floyd, Albert
Subdivision: River Rise Residential Unit 1
Zoning: A-3
Flood Zone: X
District: 4
Application #: 48706
Permit #: 000041609
Related Permit: Culvert: 000041610
Submitted: Friday, March 12, 2021
Issued: Friday, March 26, 2021
Expires: Thursday, November 18, 2021
Completed: Thursday, November 18, 2021
Status: Completed
Septic Release? Yes
Notes:

Job Details
Elevation regulation Minimum Requirement
Finished floor requirement One foot above the road
Fema map number 12023C0513C
This is the construction of a Single Family Dwelling
Setbacks Front 30
Setback Side 1 25
Setback Side 2 25
Setbacks Rear 25
Stories 1
Heated Area (Sqft) 2285
Total Area (Sqft) 3521
Building Height 25.5
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title single family
Building Code Edition 2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000) 21-0249
Review Notes
3/11/2021 Application pending.
3/12/2021 Point Review - On Hold-Incomplete
3/18/2021 Point Review - Printed-Online Application
3/22/2021 Plan Review - Reviewed CHAD, ENVIRONMENTAL HEALTH SIGNED SITE PLAN APPROVAL PAPERWORK
3/25/2021 Zoning Review - Reviewed CHAD, ENVIRONMENTAL HEALTH SIGNED SITE PLAN APPROVAL PAPERWORK
3/25/2021 Final Review - Documents Required CHAD, ENVIRONMENTAL HEALTH SIGNED SITE PLAN APPROVAL PAPERWORK
3/26/2021 Final Review - Payment Needed
3/26/2021 Permit Issued Permit #000041609 created and approved.
8/27/2021 Final Review - Payment Needed
Contractors
Name/ Business License Title Role
Stuart L Amira
Amira Builders, Inc.
CRC1327171 Cert. Residential Subcontractor
James Butler Jr
Butler Plumbing Of Gainesville Inc
CFC057960 Plumbing Contractor Subcontractor
David J Pabst
Whittle Roofing Company, Inc.
CCC1326372 Cert. Roofing Subcontractor
Ryan C Beville
Rbi Electrical Contracting Llc
Employees Workers Comp Expired.
EC13004236 Electrical Contractor Subcontractor
Robert M Bounds
Bounds Heating & Air Inc
CAC057642 Class A A/c Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Initial Driveway Mccormick, David 3/29/2021
Passed: Plumbing/Gas - 1st Underground Rough–In 90psi @ Inspection Anthony Aslan 4/27/2021
Passed: Electrical - Temporary Service Take Pictures Of Grounding Lug On Rod. Anthony Aslan 4/30/2021
Release to power company Anthony Aslan 4/30/2021
Passed: Electrical - 1st Underground Rough–In Anthony Aslan 5/10/2021
Passed: Building - Slab Anthony Aslan 5/10/2021
Passed: Building - Roof Decking Anthony Aslan 6/15/2021
Passed: Building - Wall Sheathing Anthony Aslan 6/15/2021
Passed: Building - Framing Headers In Left Side Of House Anthony Aslan 6/23/2021
Passed: Plumbing/Gas - 2nd Rough-In Anthony Aslan 6/23/2021
Rescheduled 7/8/2021:Electrical - 2nd Rough-In Troy Crews 7/6/2021
Rescheduled 7/8/2021:Mechanical - Rough In Troy Crews 7/6/2021
Cancelled: Electrical - 2nd Rough-In Anthony Aslan 7/7/2021
Cancelled: Mechanical - Rough In Anthony Aslan 7/7/2021
Passed: Electrical - 2nd Rough-In Anthony Aslan 7/8/2021
Failed: Mechanical - Rough In Missing Screws In Kitchen Exhaust Piping Anthony Aslan 7/8/2021
Passed: Mechanical - Rough In Anthony Aslan 7/12/2021
Passed: Building - Insulation Anthony Aslan 7/22/2021
Cancelled: Building - Insulation Anthony Aslan 8/23/2021
Septic Release Inspection Health Dept 8/27/2021
Passed: Engineering - Final Driveway Mccormick, David 8/30/2021
Passed: Electrical - Permanent Power Need Pictures Of Lock On Panel Anthony Aslan 8/30/2021
Release to power company Anthony Aslan 8/30/2021
Cancelled: Building - Final Anthony Aslan 11/18/2021
Passed: Building - Final Troy Crews 11/18/2021
Documents
File Name Date File Size
30bxwh2b.na5.pdf 2025.07.14 1.28MB
Ryeuqpzl.b1f.pdf 2025.07.14 1.44MB
Power Release-electrical-permanent Power 20210830.pdf 2025.07.05 11.63kB
Certificate Of Occupancy 20211118.pdf 2025.07.05 53.16kB
911 Address Form 20210317 115424.pdf 2025.07.05 109.43kB
Blower Door Test Results 20211122 075647.pdf 2025.07.05 156.16kB
Bnz Invoice 2021-08-27.pdf 2025.07.05 184.24kB
Energy Code Forms 20210317 120237.pdf 2025.07.05 138.41kB
Septic Approval Paperwork 20210326 011246.pdf 2025.07.04 573.97kB
Architectural Plans 20210315 094050.pdf 2025.07.04 1.80MB
Subcontractor Form 20210317 121648.pdf 2025.07.04 478.27kB
Property Appraiser Parcel Details Printed Page 20210315 094908.pdf 2025.07.04 275.23kB
Product Approval Code Specifications Form 20210317 122710.pdf 2025.07.04 735.34kB
Structural Engineering And Wind Load Calculations 20210315 094909.pdf 2025.07.04 3.61MB
Approved Structural 48706 2021-03-22 08.51.16.999.pdf 2025.07.04 3.64MB
Owner And Contractor Signature Page 20210312 163922.pdf 2025.07.04 1,012.82kB
Residential Or Commercial Checklist 20210317 121038.pdf 2025.07.04 3.87MB
41609-2 2021-06-16 10.02.03.814.jpg 2025.07.03 1.50MB
41609-1 2021-06-16 10.02.02.908.jpg 2025.07.03 1.67MB
41609-3 2021-06-16 10.02.04.439.jpg 2025.06.20 424.99kB
Bdt 41609 2021-11-04 09.43.45.590.jpg 2025.06.20 718.69kB
Site Plan 20210315 094909.pdf 2023.12.23 815.19kB
Final Spray Certificate Floyd 41609 2021-11-22 12.19.56.695.pptx 2023.12.23 92.08kB
Recorded Notice Of Commencement 20210315 094908.pdf 2023.12.23 72.90kB
Recorded Deed 20210311 155243.pdf 2023.12.23 59.68kB
Manual J Forms 20210315 094907.pdf 2023.12.23 202.09kB
Power Release-electrical-temporary Service 20210430.pdf 2021.04.30 39.09kB
Original Permit 20210326.pdf 2021.03.26 42.58kB