Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
Mccormick, David |
3/24/2021 |
Passed: Engineering - Final Driveway |
|
Mccormick, David |
3/24/2021 |
Passed: Building - Footer |
|
Troy Crews |
4/6/2021 |
Passed: Engineering - Setbacks |
|
Troy Crews |
4/6/2021 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Matt Forsyth |
4/28/2021 |
Passed: Building - Slab |
|
Troy Crews |
5/14/2021 |
Passed: Electrical - Temporary Service |
|
Matt Forsyth |
5/26/2021 |
Release to power company |
|
Matt Forsyth |
5/26/2021 |
Passed: Building - Lintel/Tie Beam |
|
Troy Crews |
6/1/2021 |
Passed: Building - Vertical Cells/Columns |
|
Troy Crews |
6/1/2021 |
Passed: Building - Roof Decking |
|
Matt Forsyth |
6/22/2021 |
Passed: Building - Framing |
Back Lvl Still Needs Titan Bolts (ordered) For Post Holdown |
Matt Forsyth |
6/28/2021 |
Failed: Electrical - 2nd Rough-In |
Nail Plates Needed Above Service Panel. Nail Plates Needed Where All Romex Penatrates Face Of Nailing Member 11/4 Inch |
Matt Forsyth |
8/3/2021 |
Passed: Mechanical - Rough In |
|
Matt Forsyth |
8/3/2021 |
Failed: Plumbing/Gas - 2nd Rough-In |
Nailplate Missing Cold Waterline Masterbedroom Area |
Matt Forsyth |
8/3/2021 |
Passed: Electrical - 2nd Rough-In |
|
Matt Forsyth |
8/9/2021 |
Failed: Building - Insulation |
Need Housewrap Or Plastic Sheeting To Protect Garage Opening From Getting Insulation Wet |
Matt Forsyth |
8/9/2021 |
Passed: Building - Insulation |
Master Bedroom Cold Waterline Needs Protection (nailplate) |
Matt Forsyth |
8/13/2021 |
Septic Release Inspection |
|
Health Dept |
10/29/2021 |
Failed: Electrical - Permanent Power |
No Key To Get Inside Garage Doors Lighting Not Safety Off |
Matt Forsyth |
11/5/2021 |
Rescheduled 11/12/2021:Electrical - Permanent Power |
|
Matt Forsyth |
11/10/2021 |
Failed: Electrical - Permanent Power |
Outside Meter Can Not Closing Properly Also Need Knock Out Plug In Bottom Of Can |
Matt Forsyth |
11/12/2021 |
Passed: Electrical - Permanent Power |
|
Troy Crews |
11/17/2021 |
Release to power company |
|
Troy Crews |
11/17/2021 |
Failed: Building - Final |
To Many Keys One Worked For Garage |
Matt Forsyth |
3/3/2023 |
Rescheduled 3/7/2023:Building - Final |
|
Matt Forsyth |
3/6/2023 |
Rescheduled 3/8/2023:Building - Final |
|
Matt Forsyth |
3/7/2023 |
Failed: Building - Final |
Arch Fault Receptacles Needed On 15&20 Amp Circuits Or On Breaker |
Matt Forsyth |
3/8/2023 |
Rescheduled 3/14/2023:Building - Final |
|
Matt Forsyth |
3/13/2023 |
Passed: Building - Final |
|
Matt Forsyth |
3/14/2023 |